Skip to main content

Brazil in transport spend fast lane

The Brazilian Government has announced a US$17.01billion package for new mobility and public transport infrastructure. The huge investment includes the construction of 200km of underground and light tramway lines and more than 600km of new bus lanes. The programme of works, titled 'PAC Mobilidade Urbana Grandes Cidades', is set to benefit people in 51 cities and the metropolitan areas of 18 states.
April 27, 2012 Read time: 2 mins
A JCB Loadall telescopic handler takes on concrete for the stadium refurbishment
RSSThe Brazilian Government has announced a US$17.01billion package for new mobility and public transport infrastructure.

The huge investment includes the construction of 200km of underground and light tramway lines and more than 600km of new bus lanes. The programme of works, titled 'PAC Mobilidade Urbana Grandes Cidades', is set to benefit people in 51 cities and the metropolitan areas of 18 states.

The new infrastructure, which will also create 380 new bus terminal stations and see the purchase of more than 1,000 new trains, will be part funded by the Federal state.

Also in Brazil, the Governor of São Paulo, Geraldo Alckim, says the regional road development agency 2529 Dersa, has received 25 pre-qualification bids for the tender to build six phases of the north stretch of the Brazilian city’s ring road at an estimated cost of US$3.11 billion, with the International Development Bank among the financiers.

The north stretch of the São Paulo ring road will cover 44km; will interconnect the west and east stretches, and comprises seven tunnels and 111 bridges and viaducts.

Also in Brazil, two 255 JCB customers, AMP Locações and MG Porto, have teamed up to provide five JCB machines for the redevelopment of the Governador Plácido Castelo Stadium in the city of Fortaleza, which will host six games at the Brazil 2014 World Cup in 2014. It is being expanded to a crowd capacity of 67,000.

AMP Locações and MG Porto are carrying out demolition and materials handling work on the project and JCB 3CX and JCB 4CX backhoe loaders have been equipped with hydraulic breakers to demolish the stadium’s upper cover; a 1CX backhoe loader is used to access confined spaces, and two JCB Loadall telescopic handlers are also being used.

For more information on companies in this article

Related Content

  • JCB’s Hydradig 110W proves revolutionary for French Contractors
    August 10, 2018
    The versatility of JCB’s Hydradig has landed the machine a role in a demolition application in the centre of Coventry city. The JCB Hydradig 110W was purchased by Rugby-based French Contractors, which is carrying out the project on behalf of Jackson Civil Engineering. The unit is assisting in the strengthening and rebuilding of Swanswell Viaduct between junctions one and four on the A4053, Coventry’s ring road. It is maximising an array of attachments including a Powertilt tilting hitch, a full range of
  • Green light for iRAP's BrazilRAP São Paulo
    June 3, 2024
    BrazilRAP São Paulo will use iRAP’s evidence-based Star Rating methodology to provide an objective rating of the level of safety built in to a road.
  • JCB’s latest models powered by new engine
    September 4, 2012
    To meet tough emissions legislation for Europe and North America, JCB is offering a brace of new machines powered by its latest diesel, the new Ecomax engine. JCB’s backhoe loaders, telehandlers and smaller JS excavators will be the first machines fitted with the new Ecomax engine. However this will also be installed into various models in the line-up including those in the wheeled loader, skid steer loader and rough terrain forklift ranges.
  • Brazil's planning problems
    March 23, 2012
    The authorities in Brazil have been facing problems with the expropriation of land needed for new road projects. This is a key issue for new roads planned for the 2014 Football World Cup and is affecting local governments and county councils.