Skip to main content

Brazil in transport spend fast lane

The Brazilian Government has announced a US$17.01billion package for new mobility and public transport infrastructure. The huge investment includes the construction of 200km of underground and light tramway lines and more than 600km of new bus lanes. The programme of works, titled 'PAC Mobilidade Urbana Grandes Cidades', is set to benefit people in 51 cities and the metropolitan areas of 18 states.
April 27, 2012 Read time: 2 mins
A JCB Loadall telescopic handler takes on concrete for the stadium refurbishment
RSSThe Brazilian Government has announced a US$17.01billion package for new mobility and public transport infrastructure.

The huge investment includes the construction of 200km of underground and light tramway lines and more than 600km of new bus lanes. The programme of works, titled 'PAC Mobilidade Urbana Grandes Cidades', is set to benefit people in 51 cities and the metropolitan areas of 18 states.

The new infrastructure, which will also create 380 new bus terminal stations and see the purchase of more than 1,000 new trains, will be part funded by the Federal state.

Also in Brazil, the Governor of São Paulo, Geraldo Alckim, says the regional road development agency 2529 Dersa, has received 25 pre-qualification bids for the tender to build six phases of the north stretch of the Brazilian city’s ring road at an estimated cost of US$3.11 billion, with the International Development Bank among the financiers.

The north stretch of the São Paulo ring road will cover 44km; will interconnect the west and east stretches, and comprises seven tunnels and 111 bridges and viaducts.

Also in Brazil, two 255 JCB customers, AMP Locações and MG Porto, have teamed up to provide five JCB machines for the redevelopment of the Governador Plácido Castelo Stadium in the city of Fortaleza, which will host six games at the Brazil 2014 World Cup in 2014. It is being expanded to a crowd capacity of 67,000.

AMP Locações and MG Porto are carrying out demolition and materials handling work on the project and JCB 3CX and JCB 4CX backhoe loaders have been equipped with hydraulic breakers to demolish the stadium’s upper cover; a 1CX backhoe loader is used to access confined spaces, and two JCB Loadall telescopic handlers are also being used.

For more information on companies in this article

Related Content

  • Brazilian road works planned
    April 19, 2022
    Brazilian road works are being planned.
  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • India road projects being carried out
    July 26, 2017
    The Indian Government has plans to redevelop road infrastructure links in the north east of the country. Planned spending of US$31.1 billion will be used to improve and upgrade the road network in the area by 2019. Plans have been drawn up by India’s National Highways and Infrastructure Development Corp Ltd (NHIDCL) and by the Public Works Department of states.
  • JCB’s Russian dealer has an upgraded facility
    September 19, 2013
    JCB has opened its biggest dealer depot in the world, at Ekaterinburg in Russia. Stroykomplekt (SKL) is the JCB dealer in Ekaterinburg, which is Russia’s fourth largest city and the new depot represents and investment of some €7.12 million. The facility will provide support to JCB customers in an area of Russia covering some 7 million km². SKL’s new facility covers 3,500m² and has a showroom for 25 machines as well as an impressive parts and service operation. JCB CEO Alan Blake opened the new facility. The