Skip to main content

Brazil in transport spend fast lane

The Brazilian Government has announced a US$17.01billion package for new mobility and public transport infrastructure. The huge investment includes the construction of 200km of underground and light tramway lines and more than 600km of new bus lanes. The programme of works, titled 'PAC Mobilidade Urbana Grandes Cidades', is set to benefit people in 51 cities and the metropolitan areas of 18 states.
April 27, 2012 Read time: 2 mins
A JCB Loadall telescopic handler takes on concrete for the stadium refurbishment
RSSThe Brazilian Government has announced a US$17.01billion package for new mobility and public transport infrastructure.

The huge investment includes the construction of 200km of underground and light tramway lines and more than 600km of new bus lanes. The programme of works, titled 'PAC Mobilidade Urbana Grandes Cidades', is set to benefit people in 51 cities and the metropolitan areas of 18 states.

The new infrastructure, which will also create 380 new bus terminal stations and see the purchase of more than 1,000 new trains, will be part funded by the Federal state.

Also in Brazil, the Governor of São Paulo, Geraldo Alckim, says the regional road development agency 2529 Dersa, has received 25 pre-qualification bids for the tender to build six phases of the north stretch of the Brazilian city’s ring road at an estimated cost of US$3.11 billion, with the International Development Bank among the financiers.

The north stretch of the São Paulo ring road will cover 44km; will interconnect the west and east stretches, and comprises seven tunnels and 111 bridges and viaducts.

Also in Brazil, two 255 JCB customers, AMP Locações and MG Porto, have teamed up to provide five JCB machines for the redevelopment of the Governador Plácido Castelo Stadium in the city of Fortaleza, which will host six games at the Brazil 2014 World Cup in 2014. It is being expanded to a crowd capacity of 67,000.

AMP Locações and MG Porto are carrying out demolition and materials handling work on the project and JCB 3CX and JCB 4CX backhoe loaders have been equipped with hydraulic breakers to demolish the stadium’s upper cover; a 1CX backhoe loader is used to access confined spaces, and two JCB Loadall telescopic handlers are also being used.

For more information on companies in this article

Related Content

  • JCB wins rental firm machine order worth over US$44mn
    May 13, 2013
    JCB has won an order for more than 800 machines from one of the UK’s leading rental firms - a deal worth more than US$44 million (£27mn). The lucrative A-Plant order for a huge fleet of micro, mini and midi excavators and 240 Loadall telescopic handlers is a big boost for JCB’s British factories, where all the machines will be made. Delivery of the new fleet to A-Plant’s extensive UK depot network begins this month through JCB dealer Greenshields JCB. The latest deal comes on the back of 550 machines order
  • Brazilian highway tender planned
    July 24, 2023
    A Brazilian highway tender is being planned.
  • Bertha readies for more Seattle SR99 Alaskan Way Viaduct tunnel work
    July 27, 2015
    Bertha, one of the world’s largest tunnelling machines will resume work underneath the US city of Seattle in November, nearly two years after breaking down. Bertha, at 17.4m diameter, began her journey in July 2013. She was boring a path to relocate a 3.2km stretch of the elevated State Route 99 Alaskan Way Viaduct, built between 1949 and 1953 and which carries around 100,000 vehicles daily. The elevated section will be moved underground allowing the creation of public space along Seattle’s downtown w
  • Cut in São Paulo road tolls may cause US$252.14mn revenue drop
    April 12, 2013
    A future 10% cut in toll charges on roads in São Paulo could result in US$252.14million (BRL 500mn) less in revenues a year for concessionaires CCR and EcoRodovias, according to a study of 2012 company results by economists at Valor Data. São Paulo state has reportedly closed a deal to lower tolls by 10%-20%, with Governor Geraldo Alckmin only confirming that the concession contracts would be reviewed in order to achieve lower tariffs. If prices are cut by the suggested percentages, CCR will see annual reve