Skip to main content

Brazil: Phase 2 of PAC infrastructure programme shows results

Brazil has built nearly 5,200km of roads in the past four years, according to a review of the federal government's PAC Phase 2 accelerated economic growth programme. Around 1,400 of the 5,200km were built under long-term concessions and another 7,000km are under construction. Total investment has been around US$24.43 billion. PAC is a strategic investment programme that combines management initiatives and public works, according to the World Bank. The first phase, launched in 2007, saw around $349 bil
December 18, 2014 Read time: 2 mins
RSSBrazil has built nearly 5,200km of roads in the past four years, according to a review of the federal government's PAC Phase 2 accelerated economic growth programme.

Around 1,400 of the 5,200km were built under long-term concessions and another 7,000km are under construction. Total investment has been around US$24.43 billion.

PAC is a strategic investment programme that combines management initiatives and public works, according to the World Bank. The first phase, launched in 2007, saw around $349 billion set aside for approved projects under PAC.

Similar to the first phase, PAC 2 focuses on investments in logistics, energy and social development, organised under six major initiatives: Better Cities (urban infrastructure); Bringing Citizenship to the Community (safety and social inclusion); My House, My Life (housing); Water and Light for All (sanitation and access to electricity); Energy (renewable energy, oil and gas); and Transportation (highways, railways, airports).

But some of Brazil's highways projects have hit financial snags, as 3260 World Highways reported in December.

In Minas Gerais state, 7052 Banco do Brasil is holding back funds for planned work. As a result the state government has halted work on 32 construction projects. The Banco do Brasil has not provided the expected $346 million for the work. Projects include a section of the MG-437 road between Sabara and Nova Lima. The Banco do Brasil said it may, however, release the sum in 2015.

For more information on companies in this article

Related Content

  • Kenya highway link upgrade planned
    June 19, 2017
    Plans are moving forward with regard to the upgrade work to the highway connecting Kenya’s capital Nairobi with the port of Mombasa.
  • Penta engines power biodiesel production
    October 20, 2023
    Binatural’s three BRG Slim 625kVA gensets powered by Volvo Penta's TAD-1641GE engines have undergone rigorous testing in Brazil.
  • Volvo CE R&D to drive down product cost
    January 6, 2017
    New Volvo Construction Equipment president Martin Weissburg has revealed a new emphasis for the company’s future R&D strategy – and stressed ongoing work to boost profitability. Speaking during the Swedish manufacturer’s Conexpo 2014 press conference, Weissburg, who assumed his role in January 2014, said, “There will be greater allocation of our R&D dollars towards innovations that reduce product cost. This will not be at the expense of quality or durability.”
  • Volvo CE R&D to drive down product cost
    March 7, 2014
    New Volvo Construction Equipment president Martin Weissburg has revealed a new emphasis for the company’s future R&D strategy – and stressed ongoing work to boost profitability. Speaking during the Swedish manufacturer’s Conexpo 2014 press conference, Weissburg, who assumed his role in January 2014, said, “There will be greater allocation of our R&D dollars towards innovations that reduce product cost. This will not be at the expense of quality or durability.”