Skip to main content

Brazil: Phase 2 of PAC infrastructure programme shows results

Brazil has built nearly 5,200km of roads in the past four years, according to a review of the federal government's PAC Phase 2 accelerated economic growth programme. Around 1,400 of the 5,200km were built under long-term concessions and another 7,000km are under construction. Total investment has been around US$24.43 billion. PAC is a strategic investment programme that combines management initiatives and public works, according to the World Bank. The first phase, launched in 2007, saw around $349 bil
December 18, 2014 Read time: 2 mins
RSSBrazil has built nearly 5,200km of roads in the past four years, according to a review of the federal government's PAC Phase 2 accelerated economic growth programme.

Around 1,400 of the 5,200km were built under long-term concessions and another 7,000km are under construction. Total investment has been around US$24.43 billion.

PAC is a strategic investment programme that combines management initiatives and public works, according to the World Bank. The first phase, launched in 2007, saw around $349 billion set aside for approved projects under PAC.

Similar to the first phase, PAC 2 focuses on investments in logistics, energy and social development, organised under six major initiatives: Better Cities (urban infrastructure); Bringing Citizenship to the Community (safety and social inclusion); My House, My Life (housing); Water and Light for All (sanitation and access to electricity); Energy (renewable energy, oil and gas); and Transportation (highways, railways, airports).

But some of Brazil's highways projects have hit financial snags, as 3260 World Highways reported in December.

In Minas Gerais state, 7052 Banco do Brasil is holding back funds for planned work. As a result the state government has halted work on 32 construction projects. The Banco do Brasil has not provided the expected $346 million for the work. Projects include a section of the MG-437 road between Sabara and Nova Lima. The Banco do Brasil said it may, however, release the sum in 2015.

For more information on companies in this article

Related Content

  • San Miguel Corp is among bidders in Cavite-Laguna re-auction
    March 19, 2015
    San Miguel Corporation, Metro Pacific Investments Corporation and an unidentified firm reportedly are bidding in the US$1.25 billion re-auction for work on the Cavite-Laguna Expressway. The deal involves building, operating and maintaining the 47km four-lane toll road for 35 years under a public-private-partnership. The sum includes a $448 million bid price, equal to the premium offered by SMS subsidiary Optimal Infrastructure Development during the first tender for the project in June 2014. San Miguel was
  • Mainstreaming road safety in transportation projects: scaling up global commitment
    April 6, 2017
    In its latest policy statement, the International Road Federation affirmed the essential role of road safety audits and inspections It called on multilateral institutions to introduce qualitative benchmarks and capacity strengthening programs to ensure countries progress towards a safe and forgiving road system. Road safety audits and inspections are a formal safety performance examination of an existing or future road or intersection by an independent, multidisciplinary team. They qualitatively estim
  • Six Brazilian road tenders planned
    March 10, 2023
    Six road tenders are planned in Brazil’s Sao Paulo State.
  • Brazil president Dilma Rousseff plans US$6.12bn paving-waterworks projects
    October 28, 2013
    Brazil's President Dilma Rousseff is looking to invest US$6.12 billion (BRL 13.5 billion) in basic water and sanitation and paving projects under phase 2 of the country's growth acceleration plan. President Rousseff said a total of 310 projects are to be carried out, benefiting 1,198 cities and towns, including the federal district. Besides building drainage systems, water mains, and sewer systems, 7,500km of roads will be paved and 15,000km of sidewalks will be created. The resurfacing and implementi