Skip to main content

Botswana bridge deal for Italian contractors

Two Italian contractors will handle a bridge project in Botswana. The US$93 million project will be carried out by a joint venture comprising the construction firm Cimolai and Itinera. The 1.1km-long bridge is to be built in Botswana’s Okavango Delta, providing a new link for vehicles and pedestrians. The new bridge will replace an existing link built on pontoons and is expected to open to traffic in 2019. The Okavango Delta is a large and swampy area of the country that experiences seasonal flooding and wh
January 18, 2017 Read time: 2 mins
Two Italian contractors will handle a bridge project in Botswana. The US$93 million project will be carried out by a joint venture comprising the construction firm Cimolai and Itinera. The 1.1km-long bridge is to be built in Botswana’s Okavango Delta, providing a new link for vehicles and pedestrians. The new bridge will replace an existing link built on pontoons and is expected to open to traffic in 2019. The Okavango Delta is a large and swampy area of the country that experiences seasonal flooding and which covers some 15,000km2. The delta is famed for its wildlife and though remote, provides a major draw for tourists to Botswana. Providing a new bridge will help boost the tourist trade and further develop Botswana’s economy. An environmental assessment has been carried out to ensure that the project will not impact on the local ecosystem and the joint venture partners will build the link according to necessary requirements.

Related Content

  • Bangladesh highway contract awarded
    November 15, 2022
    A major Bangladesh highway contract has been awarded.
  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.
  • New Costa Rica route in focus
    March 1, 2019
    A new road project in Costa Rica is being evaluated at present. The plans call for an upgrade of Route 32, providing an improved 46km link between Virilla River and Sucio River areas. The project would require the driving a new tunnel in parallel with the existing Zurqui Tunnel, located on the southern side of the Braulio Carillo National Park. The project is expected to cost US$643 million and the route is likely to be offered to tender under a 30 year tolled concession package. A full feasibility study ha
  • US$73 million Francis Scott Bridge replacement contract
    September 3, 2024
    Kiewit has been awarded a US$73 million Francis Scott Bridge replacement contract.