Skip to main content

Bosnia-Herzegovina motorway first

THE EBRD (European Bank for Reconstruction and Development) is increasing its support for the modernisation of the transport infrastructure of Bosnia-Herzegovina with a €21 million loan for the completion of the construction of the Banja Luka-Gradiska motorway. The motorway, being built with financing from both the EBRD and the European Investment Bank (EIB), is the first in the Republika Srpska, and links the capital Banja Luka with the international transport Corridor X [a pan- European corridor which run
July 5, 2012 Read time: 2 mins
THE EBRD (1166 European Bank for Reconstruction and Development) is increasing its support for the modernisation of the transport infrastructure of Bosnia-Herzegovina with a €21 million loan for the completion of the construction of the Banja Luka-Gradiska motorway.

The motorway, being built with financing from both the EBRD and the 1054 European Investment Bank (EIB), is the first in the Republika Srpska, and links the capital Banja Luka with the international transport Corridor X [a pan- European corridor which runs between Salzburg in Austria and Thessaloniki in Greece, passing through Austria, Slovenia, Croatia, Serbia, Macedonia and Greece].

The EBRD's new sovereign loan will be extended to the Republika Srpska Motorways, a newly-established public company responsible for managing the motorway network. The proceeds of the loan will be used to finance the construction of the Mahovljani Interchange, which will complete the missing link on the Banja Luka-Gradiska motorway. The project will also support a programme of institutional strengthening for this new company.

The project includes the construction of a 1.8km new two-lane motorway, four interchange two-lane slip roads, with a total length of 6.9km, two viaducts, which carry two of the slip roads over the new motorway, and four other bridges within the interchange.

In addition to the EBRD loan, the project is co-financed by €5 million in grant funds provided by the 2465 European Commission through its preaccession programme, and €500,000 from the Central European Initiative and the Western Balkans Investment Framework, a joint grant and lending facility established by the European Commission, the European Investment Bank, the EBRD, and the 1172 Council of Europe Development Bank to finance priority projects in the Western Balkans.

Related Content

  • Pakistan’s key highway and bridge connections
    September 28, 2017
    Plans are now being drawn up for a series of projects that will form part of the China-Pakistan Economic Corridor (CPEC). Four road projects worth over US$3.32 billion have been added to the CPEC programme. The Chinese Government is now in agreement with the plans for the CPEC. One of the new roads being built will run from Naukundi, through Mashkel and to Panjgur. The road will join National highway N-40 with CPEC Route N-85, and the Zhob-Kuchlak route. This last link forms part of the Western Corridor CPE
  • Morocco's road programme boosts economy
    February 9, 2012
    A major road programme instigated by King Mohammed VI of Morocco is helping to boost the country's economy and modernise infrastructure. This forms part of a plan to boost tourism, a key part of the country's income from 8 - 10 million. There were less than 300km of motorways existing when King Mohammed VI inherited the throne from his father in July 1999. Since then, the figure has increased to over 1,000km and this is set to almost double in the next five years. A hugely significant highway programme was
  • Bosnia: Hranjen Tunnel job to restart
    December 13, 2021
    Meanwhile, Bosnia has set aside money for Zupci and Klobuk border upgrades.
  • Bosnia bore complete
    April 25, 2012
    The contractor driving the 2.1km tunnel on Bosnia’s Gacko-Foca highway has completed the necessary excavation work and is now starting on finishing the lining of the bore. This tunnel is due to open to traffic in late 2012 and some of the €37 million financing for this work has come from the government of the autonomous entity Republika Srpska. The tunnel is one of two on the route, which also features two bridges and a viaduct. Bosnian contractor Integral Inzinjering has been working on the tunnel.