Skip to main content

Bolivian project moving forward

Bolivia's 306km Villa Tunari-San Ignacio de Moxos road is due for completion in 2014. The new road will provide and important link for the departments of Beni and Cochabamba
February 24, 2012 Read time: 2 mins
Bolivia's 306km Villa Tunari-San Ignacio de Moxos road is due for completion in 2014. The new road will provide and important link for the departments of Beni and Cochabamba, although there has been some resistance to the second stage of works and agreements will have to be reached for the work to be completed on target. As a result, Brazil has said that funding for the central stretch of the road will be granted once Bolivia finishes the socio-environmental impact studies currently underway. This will require the Bolivian Government to reach agreements with the indigenous population that will be affected by the project. The loan will be made for the first and third stretch of the route. The second will go right through the heart of the Isiboro Secure Indigenous Land National Park (Tipnis). Brazil approved a loan worth US$415 million for the project. The second stretch is the longest, at 117km, and still needs to be evaluated and designed. The first and third stretches have environmental licenses however and are already being built. This new link forms part of a wider programme to improve road infrastructure in Bolivia and the Ministry of Public Works has said that road investments for the period 2011-2014 will be in the region of $2.19 billion. The plan calls for some 2,624km of roads to be built in the 2011-2014 period. Some $500 million will be invested/year and the Ministry of Works also intended to surface all of the main RVF roads before the end of the present government's term, which will be on 21st January 2015. To achieve that aim is likely to require an investment of around $3 billion.

Related Content

  • Bolivia's Santa Cruz road corridor connector project
    December 22, 2016
    Bolivia’s ambitious Santa Cruz road corridor connector project is providing an important link for the country - Gordon Feller writes The World Bank has been organising a US$230 million loan to upgrade a vital connector linking the country’s northern and southern transit corridors. Meanwhile, another $100 million is coming from Bolivia’s government.
  • Bolivian Government to invest US$129.3mn in Moxos-Trinidad road
    October 31, 2013
    A project to improve Bolivia’s existing 77.8km road between San Ignacio de Moxos and Trinidad will cost US$129.3 million, the government has announced. The project includes a 1.7km bridge over Mamore river. The first areas of work will involve the road between San Ignacio de Moxos and Puerto Ganadero. This section will cost US$84 million and will be improved by ABC. Euroestudios-CPS Belmonte has signed a US$2.2 million contract with ABC for studies on the future Mamore river bridge. The cost of the bridge h
  • Costa Rica road projects moving forward - slowly
    July 18, 2017
    Costa Rica is moving ahead with a series of major road projects, but progress is proving slower than anticipated or desired. The Costa Rica Government is struggling to achieve satisfactory progress with its overall road improvement programme. So far the key focus has been on maintaining existing links rather than building and improving road connections. The country’s National Laboratory for Structural Material and Models (Lanamme) has produced a report revealing that 85% of the national roads are in accepta
  • Major plan for Bolivian highway expansion underway
    July 9, 2014
    Bolivia has a major programme of highway expansion and improvements underway at present in a plan designed to improve the country’s transport links. The programme includes 16 double-lane highways being built, costing some US$1.85 billion in all. The work is being managed by the state-run road administration company ABC. The roads will improve connections to La Paz, Oruro, Santa Cruz and Cochabamba. The road between La Paz and Oruro is 80% finished. The other projects will be finished between 2015 and 2018.