Skip to main content

Bolivia starts on Apolo Charasani section of La Paz road

Bolivia has started work on the new northern La Paz road, a five-year, US$250 million project. Work is underway on the first section, known as Apolo Charasani, while the second section, called Charasani-Escoma, is still under analysis. World Highways reported in September that Bolivia planned to invest nearly $510 million for road building works. The country’s state-run road company, Administradora Boliviana de Carreteras, said 32 road maintenance and construction projects stretching for 5,773km in Sant
October 31, 2014 Read time: 1 min
Bolivia has started work on the new northern La Paz road, a five-year, US$250 million project.

Work is underway on the first section, known as Apolo Charasani, while the second section, called Charasani-Escoma, is still under analysis.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18981 0 oLinkInternal reported Bolivia boosts road building budget false /categories/road-highway-structures/news/bolivia-boosts-road-building-budget/ true false%> in September that Bolivia planned to invest nearly $510 million for road building works. The country’s state-run road company, 3542 Administradora Boliviana de Carreteras, said 32 road maintenance and construction projects stretching for 5,773km in Santa Cruz department are either being looked at or worked on.

For more information on companies in this article

Related Content

  • Sennebogen premieres 70tonne telescopic crane
    April 19, 2013
    Sennebogen has plugged the gap in its telescopic crawler crane range with the introduction of the 673R-HD. The 70tonne capacity machine sits between the firm’s 40 and 80tonne models, offering a 36m four-stage main boom with two fly booms of 8m and 15m. This gives a maximum reach of 51m. The 673R-HD is powered by a Stage IIIB/Tier 4 Interim standard Deutz engine delivering 160kW. Telescopic track frames allow for a maximum transport width of just 3m, with fast set-up on site as they extend out to provide sta
  • Start of Torrens section upgrade of Adelaide’s North-South Corridor
    August 12, 2015
    Work is underway in the Australian city of Adelaide on a US$657 million upgrade of the Torrens Road to River Torrens section of the North-South Corridor. Nearly 500 workers will eventually be on site to upgrade the 3.7km section of road, of which 3km will be made into a non-stop roadway. The project includes a 2km section of non-stop lowered motorway as well as an overpass for the city’s Outer Harbour rail line. Contractors will deliver six intersection upgrades as well as improved cycling and pedestr
  • Orlaco offers advanced safety camera solution
    January 6, 2017
    Advanced camera systems for use on heavy equipment from Orlaco Products offer increased safety in construction applications. The company claims its units can be used in a wide array of duties as monitoring systems on heavy equipment, cranes, forklifts and trucks. The company says its rugged units can cope with tough duty cycles where continuous vibrations and temperature fluctuations are common, adding that its visibility solutions meet all high quality requirements. In addition, the firm offers its innovat
  • Orlaco offers advanced safety camera solution
    January 30, 2013
    Advanced camera systems for use on heavy equipment from Orlaco Products offer increased safety in construction applications. The company claims its units can be used in a wide array of duties as monitoring systems on heavy equipment, cranes, forklifts and trucks. The company says its rugged units can cope with tough duty cycles where continuous vibrations and temperature fluctuations are common, adding that its visibility solutions meet all high quality requirements. In addition, the firm offers its innovat