Skip to main content

Bolivia starts on Apolo Charasani section of La Paz road

Bolivia has started work on the new northern La Paz road, a five-year, US$250 million project. Work is underway on the first section, known as Apolo Charasani, while the second section, called Charasani-Escoma, is still under analysis. World Highways reported in September that Bolivia planned to invest nearly $510 million for road building works. The country’s state-run road company, Administradora Boliviana de Carreteras, said 32 road maintenance and construction projects stretching for 5,773km in Sant
October 31, 2014 Read time: 1 min
Bolivia has started work on the new northern La Paz road, a five-year, US$250 million project.

Work is underway on the first section, known as Apolo Charasani, while the second section, called Charasani-Escoma, is still under analysis.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18981 0 oLinkInternal reported Bolivia boosts road building budget false /categories/road-highway-structures/news/bolivia-boosts-road-building-budget/ true false%> in September that Bolivia planned to invest nearly $510 million for road building works. The country’s state-run road company, 3542 Administradora Boliviana de Carreteras, said 32 road maintenance and construction projects stretching for 5,773km in Santa Cruz department are either being looked at or worked on.

For more information on companies in this article

Related Content

  • Percussive diamond inserts from Element Six lead to longer mining drill life
    February 7, 2013
    Synthetic diamond division of DeBeers, Element Six, has developed the 3D Percussive Diamond Insert (PDI) that it claims will radically cut costs in the mining drill industry. The 3D PDI uses the firm’s polycrystalline diamond technology to optimise wear and impact resistance properties, while improving penetration rates for the drill bit. The firm claims that tests of the drill insert show up to 10 times the drill life of a conventional tungsten carbide insert., greatly reducing costly rig downtime for serv
  • Lintec showcases redesigned CSD 1500 plant at bauma
    February 12, 2013
    Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
  • Matest Asphalt Splitter will make life easier for lab technicians
    January 6, 2017
    Materials testing firm Matest has launched an asphalt splitter at bauma. The machine breaks up asphalt specimens so that the constituent parts can be tested, a task that is often carried out by hand. “The purpose of the machine is to make the operator’s life easier,” said area manager Massiono Martorini. The splitter should also lead to greater efficiency, as breaking specimens down will take less time, and allow laboratory technicians to do other things. Matest expects to sell the splitter to laboratories
  • Matest Asphalt Splitter will make life easier for lab technicians
    April 19, 2013
    Materials testing firm Matest has launched an asphalt splitter at bauma. The machine breaks up asphalt specimens so that the constituent parts can be tested, a task that is often carried out by hand. “The purpose of the machine is to make the operator’s life easier,” said area manager Massiono Martorini. The splitter should also lead to greater efficiency, as breaking specimens down will take less time, and allow laboratory technicians to do other things. Matest expects to sell the splitter to laboratories