Skip to main content

Bolivia starts on Apolo Charasani section of La Paz road

Bolivia has started work on the new northern La Paz road, a five-year, US$250 million project. Work is underway on the first section, known as Apolo Charasani, while the second section, called Charasani-Escoma, is still under analysis. World Highways reported in September that Bolivia planned to invest nearly $510 million for road building works. The country’s state-run road company, Administradora Boliviana de Carreteras, said 32 road maintenance and construction projects stretching for 5,773km in Sant
October 31, 2014 Read time: 1 min
Bolivia has started work on the new northern La Paz road, a five-year, US$250 million project.

Work is underway on the first section, known as Apolo Charasani, while the second section, called Charasani-Escoma, is still under analysis.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 18981 0 oLinkInternal reported Bolivia boosts road building budget false /categories/road-highway-structures/news/bolivia-boosts-road-building-budget/ true false%> in September that Bolivia planned to invest nearly $510 million for road building works. The country’s state-run road company, 3542 Administradora Boliviana de Carreteras, said 32 road maintenance and construction projects stretching for 5,773km in Santa Cruz department are either being looked at or worked on.

For more information on companies in this article

Related Content

  • Dana’s TE30 extends powershift transmission offering
    April 17, 2013
    Dana Holding Corporation used bauma 2013 to reveal its Spicer TE30 powershift transmission for heavy-duty materials handling applications. With five forward and three reverse speeds, the TE30 slots into the range between the TE27 and TE32 transmissions, and is compatible with engines ranging from 225-300kW. The Spicer TE30 transmission benefits from several engineering refinements to improve efficiency. These include decreased spinning speeds of internal components to lower oil churning losses, optimised cl
  • World Bank finances Uzbekistan road development
    July 7, 2015
    The World Bank will grant Uzbekistan a US$200 million loan for 25 years, including a grace period of five years. The funds will go towards the $240 million Regional Roads Development project that is scheduled to be completed by 2021, according to UzDaily.uz. Uzbekistan’s government also reported that around 117km roads were built in the first half of this year.
  • Liebherr’s HS8300HD crawler uses hybrid drive to reduce fuel consumption
    January 6, 2017
    Liebherr has developed a hybrid drive system for its HS8300HD heavy duty cycle crawler crane. The 350 tonne machine generates electrical power from its hydraulic free-fall winches, which offer up to 50 tonnes of line pull. Under this Pactronic system surplus energy is stored in a hydraulic accumulator and regenerated to assist the engine, reducing fuel consumption. This reuse of energy also cuts emissions from the machine.
  • Liebherr’s HS8300HD crawler uses hybrid drive to reduce fuel consumption
    February 7, 2013
    Liebherr has developed a hybrid drive system for its HS8300HD heavy duty cycle crawler crane. The 350 tonne machine generates electrical power from its hydraulic free-fall winches, which offer up to 50 tonnes of line pull. Under this Pactronic system surplus energy is stored in a hydraulic accumulator and regenerated to assist the engine, reducing fuel consumption. This reuse of energy also cuts emissions from the machine.