Skip to main content

Bids welcomed for Chile Route D 43 road concession

The Ministry of Public Works of Chile has opened the bids for the near US $ 227 million (CLP 109.39bn) Route D 43 road concession in Chile. Sacyr Concesiones are reported to have submitted the best offer. The road concession goes between La Serena and Ovalle.
November 5, 2012 Read time: 1 min
The Ministry of Public Works of Chile has opened the bids for the near US $ 227 million (CLP 109.39bn) Route D 43 road concession in Chile. Sacyr Concesiones are reported to have submitted the best offer. The road concession goes between La Serena and Ovalle.

Related Content

  • Healthy bidding for Poland's highway construction
    May 14, 2012
    Bidding is healthy for a section of dual carriageway in Poland linking Kurow with Lublin. The section is 60km long and has been divided by the Polish General Directorate for National Roads and Motorways (GDDKiA) into five separate bids.
  • First phase of CS ETC project in Chile inaugurated
    March 16, 2012
    CS Communication & Systèmes has announced the inauguration of the first Fast ETC lanes which the company developed on the A5 Expressway (Ruta Del Maipo) that links Puerto Montt in South Chile with Santiago Del Chile.
  • Chile projects opening for tender
    September 13, 2017
    Chile is opening seven major infrastructure projects to tender before March 2018. The projects have a total value of US$1.99 billion in all. The tenders being planned include those for the Camino de la Fruta road project and the Ruta G-21 road project.
  • Costa Rica: environmental possibly loom for Route 32 to Moin port
    October 18, 2016
    A construction start to the extension of Route 32 between Rio Frio and Limon is set for another setback after the government demanded more environmental work to be done. La Republica newspaper is reporting that Costa Rica’s Secretariat of Environment (Setena) Wants China Harbour Engineering Company (CHEC), to provide more information on the environmental impact of the proposed 107km project. Marco Arroyo, president of Setena, has told CHEC would it has until April 2017 to provide the information on v