Skip to main content

Bid to solve pothole problem

The UK now has new guidance designed to ensure that when utilities companies dig up the road surface, they leave proper repairs once the work is complete. It is estimated that poorly replaced road surfaces mean there are around 90,000 remedial works each year, adding inconvenience to motorists and cyclists. Many of the road repairs are not properly carried out, increasing the risk of potholes forming and further defects. This significantly increases the risk of accidents and of damage to vehicles. The new l
July 3, 2012 Read time: 2 mins
Road repairs not properly carried out increase the risk of potholes forming. This pothole, showing exposed wires to the traffic lights, is on a busy London road
The UK now has new guidance designed to ensure that when utilities companies dig up the road surface, they leave proper repairs once the work is complete.

It is estimated that poorly replaced road surfaces mean there are around 90,000 remedial works each year, adding inconvenience to motorists and cyclists.

Many of the road repairs are not properly carried out, increasing the risk of potholes forming and further defects. This significantly increases the risk of accidents and of damage to vehicles.

The new legislation is intended to reduce the chances of potholes developing as well as cutting down the risk that the road will have to be replaced a second time.

The UK government has set out a package of measures over the last nine months to reduce disruption caused by road works. These include proposals to increase the charges for companies whose works overrun by a factor of ten, as well as to improve signage and protection of sites and for a tougher street works inspection regime. In addition, the 5432 Department for Transport has introduced more rigorous testing and training for those who dig up the road as well as approving the first two street works permit schemes to help councils coordinate and manage works on their roads.

For more information on companies in this article

Related Content

  • London’s Westminster Council goes for gully offenders
    February 8, 2018
    Increasing numbers of blocked road drains and gullies has forced London’s Westminster City Council to take a tough stand with offenders The council maintains 16,500 gullies. Around 95% of a gully’s content is natural and can be recycled: taken away to road contractor FM Conway’s drainage treatment plant. Material is separated into solids, organics and water and reused as aggregates and materials in their wider construction business.
  • Surfaces made safe
    February 10, 2012
    Spanning Manahawkin Bay, and carrying traffic along Route 72 between Long Beach Island and Manahawkin, New Jersey, USA, the Dorland J. Henderson Memorial Bridge, known as the Manahawkin Bay Bridge, was in need of repair. New Jersey Department of Transportation (NJDOT) specified Transpo T-17 MMA polymer concrete patch and T-18 MMA polymer concrete slurry overlay as approved materials for the 12,000m² bridge rehabilitation project on the steel girder bridge. All the bridge deck spalls were prepared and patche
  • Bitumen tech: innovation for decarbonisation
    June 4, 2024
    Kristina Smith examines four new products and processes, including bio-bitumen produced from algae, designed to lower the carbon footprint of asphalt mixes.