Skip to main content

Bid to solve pothole problem

The UK now has new guidance designed to ensure that when utilities companies dig up the road surface, they leave proper repairs once the work is complete. It is estimated that poorly replaced road surfaces mean there are around 90,000 remedial works each year, adding inconvenience to motorists and cyclists. Many of the road repairs are not properly carried out, increasing the risk of potholes forming and further defects. This significantly increases the risk of accidents and of damage to vehicles. The new l
July 3, 2012 Read time: 2 mins
Road repairs not properly carried out increase the risk of potholes forming. This pothole, showing exposed wires to the traffic lights, is on a busy London road
The UK now has new guidance designed to ensure that when utilities companies dig up the road surface, they leave proper repairs once the work is complete.

It is estimated that poorly replaced road surfaces mean there are around 90,000 remedial works each year, adding inconvenience to motorists and cyclists.

Many of the road repairs are not properly carried out, increasing the risk of potholes forming and further defects. This significantly increases the risk of accidents and of damage to vehicles.

The new legislation is intended to reduce the chances of potholes developing as well as cutting down the risk that the road will have to be replaced a second time.

The UK government has set out a package of measures over the last nine months to reduce disruption caused by road works. These include proposals to increase the charges for companies whose works overrun by a factor of ten, as well as to improve signage and protection of sites and for a tougher street works inspection regime. In addition, the 5432 Department for Transport has introduced more rigorous testing and training for those who dig up the road as well as approving the first two street works permit schemes to help councils coordinate and manage works on their roads.

For more information on companies in this article

Related Content

  • Bridge of international accord from Russia-China
    May 29, 2018
    A new bridge project joining China and Russia is a sign of international accord between the two nations – Mike Woof writes A new bridge spanning what China calls the Heilongjiang River and which is known as the Amur River in Russia, is a clear sign of an important international accord between the two countries. Discussions over the bridge project were first started between China and Russia in the 1980s, with both nations seeing many changes in leadership since that time. But while the political discussion
  • Data sharing boosts workzone safety
    March 2, 2012
    Faster and safer utilities works are the benefit of innovative data sharing moves – Mike Woof writes
  • Innovative surface treatment for concrete road
    July 30, 2019
    An innovative surface treatment approach by Foster Contracting Limited has been developed for use on a £745million roads project in Aberdeen, Scotland. The specialist contractor, Foster Contracting Limited (FCL), has played a key role in a major project, to build the Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T). AWPR Construction Joint Venture, the contractor appointed to design and construct the project, approached FCL to provide a customised treatment to remove the latency from the sl
  • TransCore debuts GPS-based device for infrastructure-less tolling and safe driving applications
    May 1, 2012
    TransCore has today launched ROVR, a GPS device with GSM communications that allows infrastructure-less tolling and includes an optional driver safety monitoring feature shown to dramatically reduce accidents, improve fuel economy, and decrease Greenhouse gases (GHG).