Skip to main content

Bid to solve pothole problem

The UK now has new guidance designed to ensure that when utilities companies dig up the road surface, they leave proper repairs once the work is complete. It is estimated that poorly replaced road surfaces mean there are around 90,000 remedial works each year, adding inconvenience to motorists and cyclists. Many of the road repairs are not properly carried out, increasing the risk of potholes forming and further defects. This significantly increases the risk of accidents and of damage to vehicles. The new l
July 3, 2012 Read time: 2 mins
Road repairs not properly carried out increase the risk of potholes forming. This pothole, showing exposed wires to the traffic lights, is on a busy London road
The UK now has new guidance designed to ensure that when utilities companies dig up the road surface, they leave proper repairs once the work is complete.

It is estimated that poorly replaced road surfaces mean there are around 90,000 remedial works each year, adding inconvenience to motorists and cyclists.

Many of the road repairs are not properly carried out, increasing the risk of potholes forming and further defects. This significantly increases the risk of accidents and of damage to vehicles.

The new legislation is intended to reduce the chances of potholes developing as well as cutting down the risk that the road will have to be replaced a second time.

The UK government has set out a package of measures over the last nine months to reduce disruption caused by road works. These include proposals to increase the charges for companies whose works overrun by a factor of ten, as well as to improve signage and protection of sites and for a tougher street works inspection regime. In addition, the 5432 Department for Transport has introduced more rigorous testing and training for those who dig up the road as well as approving the first two street works permit schemes to help councils coordinate and manage works on their roads.

For more information on companies in this article

Related Content

  • Stimsonite Click Stud saves on in-situ replacement time
    April 29, 2015
    Over the past four years, there have been nine road worker deaths on the Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network. It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic. Conventional
  • Authorities plan road safety improvements for Morocco and Thailand
    September 14, 2012
    Both in Thailand and Morocco the authorities are looking separately at ways in which road safety can be improved. The two countries face similar problems with regard to road safety and have, independently, embarked on similar paths with a view to resolving the issue. Morocco’s Works and Transport Ministry is setting up a think tank that will attempt to tackle the country’s growing rate of road fatalities.
  • Campaign urges UK drivers to get eye tested every 2 years
    August 5, 2013
    A new campaign is calling on UK drivers to ‘sharpen up’ their act by getting their eyesight tested every two years to ensure their vision meets legal standards and they aren't putting people in danger. The campaign by road safety charity Brake, in association with the DVLA, insurer RSA and Specsavers, comes as new research shows many drivers are failing to ensure they can see properly on every journey. A survey of 1,000 UK drivers by Brake, RSA and Specsavers finds that a quarter of drivers (26%) haven't ha
  • Recycled organic compost stabilises embankments
    April 11, 2012
    Waste & Resources Action Programme (WRAP) is a UK government-funded body designed to encourage greater resource efficiency. This body completed a trial with contractor Balfour Beatty and the Highways Agency to test the innovative use of recycled organic compost along roadside embankments.