Skip to main content

Bell’s new logistics facility to ensure ultra-quick replacement ADT parts for customers

Bell customers across Europe are to receive their replacement articulated dump truck parts quicker than ever before after the South African hauling giant completes its new giant logistics facility in Germany.
January 6, 2017 Read time: 2 mins
Marc Schürmann, Bell’s European managing director, has revealed company plans for a new larger European logistics centre
1240 Bell customers across Europe are to receive their replacement articulated dump truck parts quicker than ever before after the South African hauling giant completes its new giant logistics facility in Germany.

Marc Schürmann, Bell’s Europe managing director, told The Daily News that the new facility in Alsfeld, central Germany, will be 12,000m², compared to the current 7,000m² facility on an adjacent site.

“It’s on the cusp of two north, south, east and west autobahn crosses in Germany. The location almost right in the centre of Germany. It’s an hour’s drive from Frankfurt, so we can have a parts pick up late afternoon, get it on the plane at night, and deliver it to the customer or dealer the very next morning.

“With the changes to the E-Series, we bought additional property and aim to do a green field development of a new facility that will be ultra-modern and have all the latest technology. From that facility we hope to deliver 24-hours-a-day.”

Bell’s final assembly facility for the Northern Hemisphere is also only one hour’s drive from Alsfeld in Eisenach – near the former East German border.

Schürmann also said that Bell was planning to bring a 60 tonne E-Series ADT onto the market by the end of next year, following the launch later in 2015 of its 50 tonne payload B50E model – a prototype of which has been exhibited this week at INTERMAT 2015. The B50E is equipped with a Stage IV/Tier 4 Final emissions compliant MTU 6R1300 engine.

“The B50E offers a five per cent improvement on fuel efficiency than our other ADTs, due to the latest engine technology on the model. We also focus on every component to give us the best weight to performance benefit, which sets us apart from many of our competitors. We are not bound to use the in-house engine, transmission or axles. We can go out and find the best trucking application.”

Schürmann said Bell expect the B50E to sell well in the UK, and the firm is looking to increase its overall range sales in the large Scandinavian quarrying sector, as well as in high growth potential territories such as North Africa, Turkey and Russia.

For more information on companies in this article

Related Content

  • Volvo CE’s electric quarry operation commences trials
    August 29, 2018
    Volvo CE is commencing operations of its low emission quarrying operation in Sweden. The facility has a strong focus on electric machines, with diesel-electric hybrid equipment also being used. According to the firm, this is a world first for a quarry facility that can be run almost 'emission-free'. Volvo CE and its customer Skanska have now commenced testing the viability of the Electric Site concept at Skanska’s Vikan Kross quarry, located near Gothenburg in Sweden. The production system at the site
  • Asphalt paving design advances
    June 15, 2012
    A diverse array of advanced paver designs is now being offered in the asphalt paving sector – Mike Woof reports With the World of Asphalt and INTERMAT 2012 events having both taken place in recent months, a series of innovations have been introduced for the asphalt paving market. Developments have come to market that widen the array of both US and European asphalt paving systems and all the major manufacturers have developed new pavers and materials feeders to meet the latest emissions requirements. Demand
  • Komatsu’s smart and clean machines offer cost benefits
    April 24, 2018
    Komatsu Europe is seeing more and more potential for its highly sophisticated intelligent machines, as well as its hybrid drive technology. Komatsu is now well established in Europe, having celebrated 50 years in the European market last year. The firm started development work on hybrid excavators back in 1999, launching its first production model in 2008. And the latest HB215-3 variant, now being launched, is the third generation of this 20tonne class machine, using a further refinement of its well-proven
  • Clever approach to reducing bridge vibrations
    November 14, 2013
    Reducing vibrations on a bridge, supplying high-quality binders to emerging countries and helping small and medium players with warm mix, this month’s stories showcase some innovative bitumen technology solutions - Kristina Smith reports The Kessock Bridge in the Highlands of Scotland has become the third bridge in the UK to be resurfaced with Gussasphalt. A dense mastic asphalt containing Nynas Endura N5, a polymer modified binder, Gussasphalt has been designed to have a longer life than standard mastic as