Skip to main content

Bell’s new logistics facility to ensure ultra-quick replacement ADT parts for customers

Bell customers across Europe are to receive their replacement articulated dump truck parts quicker than ever before after the South African hauling giant completes its new giant logistics facility in Germany.
January 6, 2017 Read time: 2 mins
Marc Schürmann, Bell’s European managing director, has revealed company plans for a new larger European logistics centre
1240 Bell customers across Europe are to receive their replacement articulated dump truck parts quicker than ever before after the South African hauling giant completes its new giant logistics facility in Germany.

Marc Schürmann, Bell’s Europe managing director, told The Daily News that the new facility in Alsfeld, central Germany, will be 12,000m², compared to the current 7,000m² facility on an adjacent site.

“It’s on the cusp of two north, south, east and west autobahn crosses in Germany. The location almost right in the centre of Germany. It’s an hour’s drive from Frankfurt, so we can have a parts pick up late afternoon, get it on the plane at night, and deliver it to the customer or dealer the very next morning.

“With the changes to the E-Series, we bought additional property and aim to do a green field development of a new facility that will be ultra-modern and have all the latest technology. From that facility we hope to deliver 24-hours-a-day.”

Bell’s final assembly facility for the Northern Hemisphere is also only one hour’s drive from Alsfeld in Eisenach – near the former East German border.

Schürmann also said that Bell was planning to bring a 60 tonne E-Series ADT onto the market by the end of next year, following the launch later in 2015 of its 50 tonne payload B50E model – a prototype of which has been exhibited this week at INTERMAT 2015. The B50E is equipped with a Stage IV/Tier 4 Final emissions compliant MTU 6R1300 engine.

“The B50E offers a five per cent improvement on fuel efficiency than our other ADTs, due to the latest engine technology on the model. We also focus on every component to give us the best weight to performance benefit, which sets us apart from many of our competitors. We are not bound to use the in-house engine, transmission or axles. We can go out and find the best trucking application.”

Schürmann said Bell expect the B50E to sell well in the UK, and the firm is looking to increase its overall range sales in the large Scandinavian quarrying sector, as well as in high growth potential territories such as North Africa, Turkey and Russia.

For more information on companies in this article

Related Content

  • Cummins PLUS engines for China
    April 7, 2023
    Cummins unveiled a generation of clean off-road engines that meet China’s National Stage IV emissions (CS IV) which came into effect on December 1, 2022.
  • Heavy equipment transport
    February 14, 2012
    Several manufacturers are now offering new solutions for moving heavy construction equipment, with German firms DOLL, Goldhofer and Zandt all introducing new models. DOLL says that its compact Panther units feature new running gear that is said to improve on-road handling and load capacity considerably over competing products in the same size class.
  • Wacker Neuson builds on Caterpillar link
    November 14, 2012
    Bolstered by building machines for Caterpillar and high demand for its VDS equipped excavators, Wacker Neuson has greatly increased its compact equipment building capability in Linz - Nick Johnson reports At a time when some other construction equipment makers have still scaled back their operations following the global economic crisis, Wacker Neuson has been busy building new facilities and increasing its production capacity. Last month the company officially opened its new compact equipment production fac
  • Volvo CE president delighted with US$160 million acquisition of Terex haulers
    January 6, 2017
    New Volvo Construction Equipment president Martin Weissburg hopes that the group’s US$160 million December 2013 acquisition of the Terex Equipment rigid and articulated hauler business will be finalised during the second quarter of 2014. It has been an important move for Volvo he said.