Skip to main content

Bauma exhibit of model of Astec’s M-Pack asphalt facility

Astec, an Astec Industries company, and one of North America’s leading manufacturers of state-of-the-art asphalt plants, will exhibit as part of the Astec Industries stand. On display will be a one-eighth scale model of a complete Astec M-Pack relocatable asphalt facility. Since its debut at ConExpo 2005, the award-winning Astec model has garnered acclaim by putting an entire asphalt plant on a human scale with remarkable attention to detail. “The innovative M-Pack facility features the Astec exclusive Doub
January 6, 2017 Read time: 2 mins
The one-eighth scale model of a complete Astec M-Pack relocatable asphalt facility
Astec, an 681 Astec Industries company, and one of North America’s leading manufacturers of state-of-the-art asphalt plants, will exhibit as part of the Astec Industries stand.

On display will be a one-eighth scale model of a complete Astec M-Pack relocatable asphalt facility.

Since its debut at ConExpo 2005, the award-winning Astec model has garnered acclaim by putting an entire asphalt plant on a human scale with remarkable attention to detail.

“The innovative M-Pack facility features the Astec exclusive Double Barrel technology and new generation long-term storage silos,” says Astec.

“Created for producers who don’t move often but want to reap the benefits of fast plant setup when they do, the M-Pack is designed with self-contained, skid-mounted modules for maximum efficiency and cost savings. Another added benefit is the minimal site preparation costs that are required to accommodate an Astec M-Pack Double Barrel plant.”

Also on display will be an actual full-size Astec Double Barrel drum dryer/mixer. The Double Barrel dryer/drum mixer combines the functions of a dryer and a continuous-process mixer in one compact, efficient system. Drying of the virgin aggregate is the first step in the process and takes place inside the inner drum. Mixing of aggregate and other ingredients follows, which happens in the outer chamber of the stationary shell. Each drying and mixing step will be highlighted on this drum.

“Equally important to the state-of-the-art technology and high quality that every Astec plant offers, is their commitment to after-sales service, technical support and parts support. Service personnel are dispatched globally to support the set up and commissioning of plants as well as to train plant operators,” says the company.

Stand: F11.1111/5

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.AstecIndustries.com www.AstecIndustries.com false http://www.astecindustries.com/ false false%>

For more information on companies in this article

Related Content

  • JCB’s Ecomax engines make their debut at bauma
    January 6, 2017
    JCB’s Ecomax engine – the company’s innovative solution to EU Stage IIIB/US Tier 4 emissions legislation - will be on show for the first time at bauma as machines powered by it make their debut. The UK-based construction equipment manufacturing giant claims it is the only leading equipment manufacturer in the world to have met the stringent Stage IIIB/Tier 4 interim emissions legislation without the use of diesel particulate filter (DPF) or after-treatment – resulting in the world’s cleanest and most effici
  • JCB’s Ecomax engines make their debut at bauma
    February 18, 2013
    JCB’s Ecomax engine – the company’s innovative solution to EU Stage IIIB/US Tier 4 emissions legislation - will be on show for the first time at bauma as machines powered by it make their debut. The UK-based construction equipment manufacturing giant claims it is the only leading equipment manufacturer in the world to have met the stringent Stage IIIB/Tier 4 interim emissions legislation without the use of diesel particulate filter (DPF) or after-treatment – resulting in the world’s cleanest and most effici
  • Asphalt plans silos increase efficiency, reduce waste
    April 10, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Asphalt plans silos increase efficiency, reduce waste
    May 8, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.