Skip to main content

Bangkok plans to spend US$3.5bn to build mega underground tunnels

Thailand could emulate Malaysia's twin smart-tunnel project through its own proposed Thailand Underground Tunnelling Group (TUTG) project, with an estimated investment of US$3.5 billion. Under the TUTG propsal, two large tunnels are to be constructed in Bangkok's underground to channel the city's rainwater surplus during heavy monsoons to refill its underground reserves whose water levels are now decreasing. When there is no major flood in Bangkok, the tunnels would be transformed into an underground roadwa
May 24, 2013 Read time: 2 mins
Thailand could emulate Malaysia's twin smart-tunnel project through its own proposed Thailand Underground Tunnelling Group (TUTG) project, with an estimated investment of US$3.5 billion.

Under the TUTG proposal, two large tunnels are to be constructed in Bangkok's underground to channel the city's rainwater surplus during heavy monsoons to refill its underground reserves whose water levels are now decreasing. When there is no major flood in Bangkok, the tunnels would be transformed into an underground roadway to ease the city traffic.

Malaysia’s twin-smart tunnel project in the country’s capital, Kuala Lumpur, known as the 5333 Stormwater Management and Road Tunnel (SMART) and the first tunnel of its kind in the world, is an innovative solution to Kuala Lumpur’s long-term traffic and stormwater management problems. The dual-purpose tunnel is diverting floodwaters away from the confluence of the two major rivers running through the city centre, while its central section is doubling up as a two-deck motorway to relieve traffic congestion at the main southern gateway into the city centre.

SMART was originally conceived as a flood relief tunnel to divert the 1 in 100 year flood away from the city centre. Then it was considered that the 11.8m internal diameter tunnel could be utilised in periods of low rainfall as a highway tunnel to alleviate Kuala Lumpur’s congested highway infrastructure. 2579 Mott MacDonald was approached by the MMC Engineering Group-Gamuda joint venture to carry out the feasibility study for this innovative dual purpose tunnel and then provide detailed design services to take the project from concept through to construction, working in association with SSP Consultants. Under the supervision of Mott MacDonald/SSP on behalf of the joint venture, the highway section and bypass tunnel were both completed and operational by May 2007.

The overall US$500 million plus scheme comprised 9.5km of tunnel with the central 3km incorporating a double deck motorway. Major components include an upstream intake structure, holding pond and storage reservoir, diversion tunnel, twin box culvert and ingress/egress connectors to the motorway tunnel. Ventilation of the road tunnel required construction of four 15m-high shaft structures.

For more information on companies in this article

Related Content

  • Sale is slow for South Klang Valley Expressway and Silk Highway
    June 8, 2016
    Malaysia’s South Klang Valley Expressway (SKVE) remains unsold despite being up for sale “for some tie”. The Star newspaper reported unnamed sources saying the SKVE has suffered from low traffic volumes, compared with the Silk Highway, which is now also up for sale. SKVE connects to the 37km Silk Highway – also known as the Kajang Traffic Dispersal Ring Road - at the Universiti Tenaga Nasional interchange, collectively stretching from Seri Kembangan to Pulau Indah. Together, 90km of continuous high
  • Mott MacDonald Grontmij is handling key improvement scheme in UK
    May 16, 2013
    The Mott MacDonald Grontmij joint venture is working on plans for a € 189 million (£160 million) upgrade of the A63 Castle Street in the UK city of Hull. The partners were appointed by the Highways Agency to develop proposals for the scheme, which is intended to reduce journey times to the Port of Hull, ease congestion and improve safety on the city centre section of the A63. The route is currently one of the busiest sections of road in East Yorkshire. This 1.5km dual carriageway runs in an east-west direct
  • Mott MacDonald Sweco JV to design part of A96 dualling, Scotland
    June 16, 2016
    A Mott MacDonald and Sweco joint venture has been appointed by Transport Scotland to carry out route option assessment and detailed design work for dualling of the A96 highway between Hardmuir and Fochabers. The nearly 47km stretch of the road will provide users with improved journey times between two of Scotland’s economic hubs, the cities of Inverness and Aberdeen. In 2011, the Scottish Government published its Infrastructure Investment Plan which set out the Government’s plans for infrastructure i
  • Key A14 upgrade for the UK to cut congestion
    September 11, 2013
    A joint venture comprising BAM Nuttall and Morgan Sindall will carry out the 4km widening of the UK’s heavily congested A14 route. The €28.5 million (£24 million) project is being carried out for the Highways Agency to reduce journey times more reliable, improve safety and support proposed local development. Mott MacDonald will carry out the design work for the project. Junctions 7-9 of the A14 are highly congested at present due to a combination of heavy commuter traffic and the high percentage of HGVs car