Skip to main content

Bang: big bridge blocking boulder broken by blasting

Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hol
April 24, 2013 Read time: 1 min
Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hole then being charged with conventional explosives. The blast then broke the boulder into pieces small enough for lighter machinery to move out of the way, allowing the bridge to be reopened to traffic.

Related Content

  • Parking problems in Bristol
    August 21, 2015
    It seems that people will park in the smallest of places, despite the efforts of urban street designers and town planners to ensure an orderly arrangement of suitably spaced cars. The advent of smaller-than-small cars has meant that drivers will park in smaller-and-smaller spaces. Surely some spaces are just too small to attract drivers of even the smallest car. But the city of Bristol, in southwest England, has taken no chances and has painted the double-yellow ‘no parking’ lines in areas where no one in t
  • Looking into the future of construction with Topcon
    January 8, 2024
    Topcon Positioning’s Yassir Shanshal, senior vice president of Global Quality, Service and Kris Cowles, executive vice president & CIO spoke with Mike Woof of World Highways on Topcon’s view for the future.
  • Trimble’s vision of a far more efficient future
    July 5, 2021
    Trimble is offering a future with more efficient, optimised construction operations for faster project delivery
  • Cost-saving benefits of dual layer asphalt paving
    February 14, 2012
    Sophisticated dual layer paving technologies currently on the market are said to offer major advantages to road builders. Roads built using twin layer, hot on hot paving techniques can last considerably longer than those constructed using conventional methods. Contractors and clients also stand to gain from savings on materials costs, through the elimination of the need for emulsion spraying between binder and wearing courses and with the use of thin layer wearing course designs. At present two paver man