Skip to main content

Bang: big bridge blocking boulder broken by blasting

Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hol
April 24, 2013 Read time: 1 min
Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hole then being charged with conventional explosives. The blast then broke the boulder into pieces small enough for lighter machinery to move out of the way, allowing the bridge to be reopened to traffic.

Related Content

  • Auckland Harbour bridge celebrates 50 years
    April 5, 2012
    The bridge over Auckland Harbour celebrates its half century this year, and it has been given a major upgrade to ensure that safety is maintained in New Zealand's largest city. Mary Searle reports. Auckland is New Zealand's largest city, home to nearly a third of the entire country's population. It's a sprawling metropolis, and its 1.3 million people are spread over 637km² of city, suburbs and islands. The Auckland Harbour Bridge, which celebrates its 50th birthday in May, is a vital link in the city's road
  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • Holiday traffic jams
    October 3, 2018
    In the Northern Hemisphere the summer means time for families to head off on holiday. At this time of year, many busy routes become jammed as holidaymakers head north, south, east or west, all in search of some rest and recreation. In the UK for example, the start of the school holiday period typically leads to families taking to the roads, with massive spikes in traffic volumes as a result. Some areas are particularly bad. The highway routes lying roughly between Munich in southern Germany and Milan in no