Skip to main content

Bang: big bridge blocking boulder broken by blasting

Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hol
April 24, 2013 Read time: 1 min
Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hole then being charged with conventional explosives. The blast then broke the boulder into pieces small enough for lighter machinery to move out of the way, allowing the bridge to be reopened to traffic.

Related Content

  • Zhejiang Jiashao Bridge Investment & Development Co
    April 6, 2017
    Located in Zhejiang Province of China, Jiashao Bridge spans the Qiantang River and connects the cities of Jiaxing and Shaoxing. The total length of the bridge project is 10.14km and carries an eight-lane expressway The Qiantang River suffers from a high flow rate of up to 7.5m/s. As the tidal range is around 7-9m, the water depth is less than 2m in time of low level tide, so ships can only move at high tide and large scale ship-lifting equipment cannot be used downstream of Jiashao Bridge. However, to
  • Canadian air
    February 8, 2012
    Compressors from Atlas Copco are proving highly useful in highly diverse applications, on a bridge project and a quarry in Canada. Water ingress over 30 years has damaged a road bridge in Quebec City, Canada, deteriorating the concrete and breaking down the rubber expansion joints at both ends of the 150m long structure. City highway authority, Transportes Quebec, awarded local contracting company Inter-Structures the contract to replace the deteriorated concrete and fit new membrane seals. The bridge, clos
  • Export focus for XCMG, with Latin America as key territory
    November 13, 2014
    Exports are crucial to XCMG’s growth and its aim to becoming a dominant player in the worldwide construction machinery market – Mike Woof writes One of China’s biggest construction equipment manufacturers, XCMG has a high profile, and particularly in the country’s home market. XCMG is a leader in key equipment categories such as concrete pumping and lifting technologies. The firm’s 4,000tonne crawler crane introduced two years ago has already proven its worth in a massive industrial construction appl
  • Export focus for XCMG, with Latin America as key territory
    January 6, 2017
    Exports are crucial to XCMG’s growth and its aim to becoming a dominant player in the worldwide construction machinery market – Mike Woof writes One of China’s biggest construction equipment manufacturers, XCMG has a high profile, and particularly in the country’s home market. XCMG is a leader in key equipment categories such as concrete pumping and lifting technologies. The firm’s 4,000tonne crawler crane introduced two years ago has already proven its worth in a massive industrial construction appl