Skip to main content

Bang: big bridge blocking boulder broken by blasting

Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hol
April 24, 2013 Read time: 1 min
Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hole then being charged with conventional explosives. The blast then broke the boulder into pieces small enough for lighter machinery to move out of the way, allowing the bridge to be reopened to traffic.

Related Content

  • Driving ahead with tunnelling developments
    June 13, 2012
    New technologies are coming to market with regard to driving and supporting tunnels, with drilling and blasting and accompanying shotcreating technologies being widely used worldwide. Drilling and blasting can be a cost-effective method in the right conditions and in this segment Atlas Copco and Sandvik hold major market shares worldwide, although other firms such as Furukawa and Montabert also compete. Shotcreting equipment is widely used following after drilling and blasting, with CIFA broadening its rang
  • Sandvik construction machines helping build Hong Kong tunnel link
    October 11, 2017
    Machines from Sandvik are playing important roles in the construction of a new tunnel connection to Hong Kong. The Liantang/Heung Yuen Wai Boundary Control Point (BCP for short) is a series of infrastructure projects that will see the construction of the latest land crossing between Shenzhen in China and Hong Kong. This project includes the construction of highways and tunnels. The crushing and drilling equipment from Sandvik Mining and Rock Technology being used for the work is being supported by Sandvik’
  • Norsenga Bridge undergoes weathering tests
    May 19, 2023
    Norway’s Statens Vegvesen says the wooden truss bridge – opened only in 2017 – will be the subject of a study in conjunction with the Norwegian University of Science and Technology.
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges