Skip to main content

Bang: big bridge blocking boulder broken by blasting

Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hol
April 24, 2013 Read time: 1 min
Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hole then being charged with conventional explosives. The blast then broke the boulder into pieces small enough for lighter machinery to move out of the way, allowing the bridge to be reopened to traffic.

Related Content

  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.
  • The payload answer for ADT haulage?
    July 8, 2016
    Will increased ADT load capacity provide a suitable solution to increasing aggregate and earthmoving haulage needs? Mike Woof reports The rule of thumb with off-highway machinery is that for bulk operations, larger equipment can deliver economies of scale, with bigger payloads allowing a better cost/tonne. Heavier machines may be less versatile than more compact units, so a type of equipment that retains its versatility as it is scaled up in size can offer major benefits. For the articulated dumptruc
  • Safer blasting
    July 4, 2012
    Three years of development and field trials have resulted in the proven SparkMaster system from ASL. This sophisticated initiator is said to meet the needs of explosive engineers requiring a reliable shocktube-based system. The SparkMaster has been designed to suit an array of site conditions and can provide reliability even in challenging environments. The solid-state, ergonomically-designed unit is portable, robust, highly-visible and weighs just 700grammes. It can be operated while still inside its weath
  • Cut and cover consolidation
    July 10, 2012
    Foundation specialist Forasol has developed an innovative technique for anchor drilling that is improving ground consolidation on road projects in Switzerland. The technique has been widely used on a number of highway projects in the country, including construction of a new 1.3km long cut-and-cover trench for the A9 highway in south western Switzerland.