Skip to main content

Balfour included on major UK Highways Agency framework contract

Balfour wins place on major UK Highways Agency road framework contract Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion). Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Del
November 7, 2014 Read time: 2 mins
Balfour wins place on major 1441 UK Highways Agency road framework contract

1146 Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion).

Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Delivery Framework.

The overall framework, which includes lots for other types of work, will deliver the largest ever upgrade of England’s strategic road network, valued between $6.3 billion and $9.5 billion (£4 billion and £6 billion) by 2021.

The framework lasts for four years with an option for a mutually agreed one-year extension. Individual contracts within the framework will be allocated either through the agreement of target costs or by mini-competitions where several tenders are submitted.

Nicholas Pollard, Balfour Beatty construction services UK chief executive, said the company has a strong record delivering major contracts by working closely with the Highways Agency. Balfour Beatty, in partnership with 2296 Skanska, 3005 Atkins and 2643 Egis, delivered a 30-year $9.8 billion (£6.2 billion) M25 design build finance and operate project which included widening more than 100km of motorway to four lanes.

Balfour Beatty is also currently delivering the agency’s $291 million (£184 million) Manchester Smart Motorway scheme and the $204.4 million (£129 million) M3 Smart Motorway scheme.

The framework is intended to promote collaborative behaviour, such as standardisation and pre-fabrication, in order to lower costs, deliver better quality faster and to improve health and safety behaviour.

Graham Dalton, Highways Agency chief executive, said the framework is the largest that the agency has awarded. “It is not just the scale of this framework that is important, but the way it is designed to bring the agency, designers and contractors together in one large collaborative team. We expect to deliver this major investment programme efficiently, speedily and with real effort to minimise disruption to road users while we build,” he said.

For more information on companies in this article

Related Content

  • Sales gain for Italian manufacturers
    February 22, 2016
    An upswing is being seen in construction machine sales in Italy, according to the latest official figures. The data from the Samoter-Prometeia Observatory reveal increases in key markets. Gains have been seen in Europe (+7.7%), Central and Eastern Europe and Turkey (+3.7%), North America (+23.1%), Central and South America (+6.3%), Middle East (+26.3%), Asia (+28.7%), Australia (+23.5%) and Africa (+2.5%). However the figures also show another sharp fall in Russia (-62.8%).
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.
  • Balfour and Vinci slide bridge over the M42
    January 6, 2023
    Workers slid the concrete shell of a 12,600-tonne bridge a record 165m to position it across the M42 motorway in the northern English county of Warwickshire.
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c