Skip to main content

Balfour included on major UK Highways Agency framework contract

Balfour wins place on major UK Highways Agency road framework contract Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion). Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Del
November 7, 2014 Read time: 2 mins
Balfour wins place on major 1441 UK Highways Agency road framework contract

1146 Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion).

Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Delivery Framework.

The overall framework, which includes lots for other types of work, will deliver the largest ever upgrade of England’s strategic road network, valued between $6.3 billion and $9.5 billion (£4 billion and £6 billion) by 2021.

The framework lasts for four years with an option for a mutually agreed one-year extension. Individual contracts within the framework will be allocated either through the agreement of target costs or by mini-competitions where several tenders are submitted.

Nicholas Pollard, Balfour Beatty construction services UK chief executive, said the company has a strong record delivering major contracts by working closely with the Highways Agency. Balfour Beatty, in partnership with 2296 Skanska, 3005 Atkins and 2643 Egis, delivered a 30-year $9.8 billion (£6.2 billion) M25 design build finance and operate project which included widening more than 100km of motorway to four lanes.

Balfour Beatty is also currently delivering the agency’s $291 million (£184 million) Manchester Smart Motorway scheme and the $204.4 million (£129 million) M3 Smart Motorway scheme.

The framework is intended to promote collaborative behaviour, such as standardisation and pre-fabrication, in order to lower costs, deliver better quality faster and to improve health and safety behaviour.

Graham Dalton, Highways Agency chief executive, said the framework is the largest that the agency has awarded. “It is not just the scale of this framework that is important, but the way it is designed to bring the agency, designers and contractors together in one large collaborative team. We expect to deliver this major investment programme efficiently, speedily and with real effort to minimise disruption to road users while we build,” he said.

For more information on companies in this article

Related Content

  • Geosynthetics revolutionise ground stabilisation
    March 13, 2012
    As powerful fabrics, geosynthetics and geotextiles have a wide range of applications in many civil engineering applications including roads and airfields. Geosynthetics specialist Tensar is introducing a radical new product that it thinks will revolutionise the construction industry. According to the company, its new product represents the "biggest advance in ground stabilisation technology for 25 years. Six years in development, it is said to offer major improvements in aggregate confinement and soil stabi
  • The cycle of potholes in the UK
    October 1, 2019
    Since 2015 almost a million potholes have been recorded annually by UK local authorities, with the 2016 count reaching 1,088,965, according to an insurance provider.
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.