Skip to main content

Balfour included on major UK Highways Agency framework contract

Balfour wins place on major UK Highways Agency road framework contract Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion). Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Del
November 7, 2014 Read time: 2 mins
Balfour wins place on major 1441 UK Highways Agency road framework contract

1146 Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion).

Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Delivery Framework.

The overall framework, which includes lots for other types of work, will deliver the largest ever upgrade of England’s strategic road network, valued between $6.3 billion and $9.5 billion (£4 billion and £6 billion) by 2021.

The framework lasts for four years with an option for a mutually agreed one-year extension. Individual contracts within the framework will be allocated either through the agreement of target costs or by mini-competitions where several tenders are submitted.

Nicholas Pollard, Balfour Beatty construction services UK chief executive, said the company has a strong record delivering major contracts by working closely with the Highways Agency. Balfour Beatty, in partnership with 2296 Skanska, 3005 Atkins and 2643 Egis, delivered a 30-year $9.8 billion (£6.2 billion) M25 design build finance and operate project which included widening more than 100km of motorway to four lanes.

Balfour Beatty is also currently delivering the agency’s $291 million (£184 million) Manchester Smart Motorway scheme and the $204.4 million (£129 million) M3 Smart Motorway scheme.

The framework is intended to promote collaborative behaviour, such as standardisation and pre-fabrication, in order to lower costs, deliver better quality faster and to improve health and safety behaviour.

Graham Dalton, Highways Agency chief executive, said the framework is the largest that the agency has awarded. “It is not just the scale of this framework that is important, but the way it is designed to bring the agency, designers and contractors together in one large collaborative team. We expect to deliver this major investment programme efficiently, speedily and with real effort to minimise disruption to road users while we build,” he said.

For more information on companies in this article

Related Content

  • Building a major Turkish highway project
    August 15, 2018
    The North Marmara Motorway Project in Turkey has been a major focus for project financing, as well as for novel technical solutions for its construction. This mega infrastructure project is intended to boost transport connectivity between the European and Asian sides of Turkey International law firm Winston & Strawn LLP has advised on major project financing for two sections of the highway. The structure for implementation of the Project is based on the build-operate-transfer (BOT) concession model. The
  • Long-lasting surface repairs for Avonmouth Bridge
    July 9, 2012
    Two technologies combined to give a heavily used bridge a new surface that should last for years The Avonmouth Bridge carries the M5 motorway over the River Avon, and is a vital part of the road infrastructure in south-west England, linking the counties of Somerset, Devon and Cornwall to the rest of the country. Completed in 1973, it carries commuters to the city of Bristol, and to South Wales, along with holidaymakers. The 1.4km long steel box girder bridge comprising a 16,000m2 steel decked central span a
  • Steel for Loch Ba bridge
    February 6, 2012
    Allerton Steel, on behalf of R J McLeod, has fabricated the steelwork for a replacement bridge at Loch Ba on Rannoch Moor in the Highlands as part of its A82 upgrade scheme for Transport Scotland. R J McLeod is the civil contractor on the £2.2 million (E2.6 million) scheme which replaces the existing three-span reinforced concrete bridge.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci