Skip to main content

Bahrain work on track

Work on Bahrain's Eisa Town Gate Intersection project is to get back on track shortly. The work stopped when South Korean contractor Sungwon was afflicted by financial issues due to funding problems encountered in Dubai and South Korea.
February 6, 2012 Read time: 1 min
Work on Bahrain's Eisa Town Gate Intersection project is to get back on track shortly. The work stopped when South Korean contractor 2285 Sungwon was afflicted by financial issues due to funding problems encountered in Dubai and South Korea. The Bahrain Government is appointing another contractor to take over the project and the work could be completed by September of this year.

For more information on companies in this article

Related Content

  • Ethiopia’s building roads
    November 29, 2013
    Ethiopia is set to benefit economically from investment in a number of new key road links totalling over US$1 billion. The east African nation’s 218km Modjo-Hassan highway is expected to cost US$720 million to construct. The highway will be constructed in two stages. The first section of the route will stretch 93km from Modjo to Zeway and is expected to cost $350 million to complete. The second section of the highway will be 125km long and link Zeway with Hewassa and this stretch is estimated to cost $370
  • Off road trials for electric highways technology
    August 11, 2015
    Following the completion of the feasibility study commissioned by Highways England into dynamic wireless power transfer technologies, off road trials of the technology needed to power electric and hybrid vehicles on England’s major roads are due to take place later this year. The trials are the first of their kind and will test how the technology would work safely and effectively on the country’s motorways and major A roads, allowing drivers of ultra-low emission vehicles to travel long distances without
  • Kenya develops annuity road funding model
    May 8, 2015
    Kenya is introducing novel methods for funding its necessary road infrastructure development - Shem Oirere writes. Kenya has unveiled a new financing model for road construction and reviewed its design standards and construction methodologies, which forms part of a new strategy for the East African country. Under this new plan Kenya is planning to upgrade 10,000km of road, with these links featuring asphalt surfacing; the work being carried out over the next five years at a cost of US$2.8 billion. Despite t
  • Crash cushion design
    February 13, 2012
    There are key differences in crash cushion design and quality for the United States and European markets. Developments in barrier technologies have followed the varying demands of specific markets, resulting in manufacturers offering different solutions for US and European needs.