Skip to main content

Azerbaijan loan for Belgrade-South Adriatic motorway

The President of Azerbaijan, Ilham Alijev, has reportedly approved an agreement that will see Serbia receive US$407.75million for the construction of a section of the Belgrade to South Adriatic motorway. The loan for the motorway section between Ljig and Preljina will be repayable over a 15 year period, with a grace period of three years and a fixed interest rate of 4%. The construction project, which will include five tunnels and over 60 bridges, will be carried out by the Azerbaijan-based company Azvirt
May 2, 2012 Read time: 1 min
The President of Azerbaijan, Ilham Alijev, has reportedly approved an agreement that will see Serbia receive US$407.75million for the construction of a section of the Belgrade to South Adriatic motorway.

The loan for the motorway section between Ljig and Preljina will be repayable over a 15 year period, with a grace period of three years and a fixed interest rate of 4%. The construction project, which will include five tunnels and over 60 bridges, will be carried out by the Azerbaijan-based company 5414 Azvirt along with several Serbian construction firms.

For more information on companies in this article

Related Content

  • Warm mix use in the US and Czech Republic is strong
    May 20, 2014
    The Czech Republic has seen its first ever use of warm mix produced using additive Evotherm - and a survey carried out in the US shows that warm mix is still on the rise there - Kristina Smith reports The troubled Blanka Tunnel in Prague will see the Czech Republic’s first ever use of Evotherm warm mix asphalt (WMA) technology. The 6km tunnel is the longest urban motorway tunnel in Europe and will take the north-west section of the city ring road below ground. Designed as dual carriageway throughout w
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Fehmarn Belt tunnel work to start in January
    April 29, 2020
    Construction of the large-scale tunnel element factory at Rødbyhavn can now start soon.
  • Tender opening for crucial new Bulgarian highway
    November 14, 2012
    The authorities in Bulgaria are in the tender process for the new Sofia-Kalotina highway project. The tender is for a 31.5km section of highway that will connect Bulgarian capital Sofia with Kalotina on the border with Serbia. The deadline for submitting the tender offers is 7th January 2013. Meanwhile in Sofia itself, a €100 million project to improve key roads in the city is now due to commence. Some €50 million of the funding required for the project is being provided in loan form by the European Invest