Skip to main content

Azerbaijan loan for Belgrade-South Adriatic motorway

The President of Azerbaijan, Ilham Alijev, has reportedly approved an agreement that will see Serbia receive US$407.75million for the construction of a section of the Belgrade to South Adriatic motorway. The loan for the motorway section between Ljig and Preljina will be repayable over a 15 year period, with a grace period of three years and a fixed interest rate of 4%. The construction project, which will include five tunnels and over 60 bridges, will be carried out by the Azerbaijan-based company Azvirt
May 2, 2012 Read time: 1 min
The President of Azerbaijan, Ilham Alijev, has reportedly approved an agreement that will see Serbia receive US$407.75million for the construction of a section of the Belgrade to South Adriatic motorway.

The loan for the motorway section between Ljig and Preljina will be repayable over a 15 year period, with a grace period of three years and a fixed interest rate of 4%. The construction project, which will include five tunnels and over 60 bridges, will be carried out by the Azerbaijan-based company 5414 Azvirt along with several Serbian construction firms.

For more information on companies in this article

Related Content

  • EBRD financing for Albania and Kosovo
    December 16, 2020
    Financing from the EBRD will pay for works in Albania and Kosovo.
  • Denmark to create Rodby port to service Fehmarn Belt construction
    January 6, 2015
    The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b