Skip to main content

Azerbaijan loan for Belgrade-South Adriatic motorway

The President of Azerbaijan, Ilham Alijev, has reportedly approved an agreement that will see Serbia receive US$407.75million for the construction of a section of the Belgrade to South Adriatic motorway. The loan for the motorway section between Ljig and Preljina will be repayable over a 15 year period, with a grace period of three years and a fixed interest rate of 4%. The construction project, which will include five tunnels and over 60 bridges, will be carried out by the Azerbaijan-based company Azvirt
May 2, 2012 Read time: 1 min
The President of Azerbaijan, Ilham Alijev, has reportedly approved an agreement that will see Serbia receive US$407.75million for the construction of a section of the Belgrade to South Adriatic motorway.

The loan for the motorway section between Ljig and Preljina will be repayable over a 15 year period, with a grace period of three years and a fixed interest rate of 4%. The construction project, which will include five tunnels and over 60 bridges, will be carried out by the Azerbaijan-based company 5414 Azvirt along with several Serbian construction firms.

For more information on companies in this article

Related Content

  • Sri Lanka benefiting from external highway investment
    July 16, 2013
    Key highway projects in Sri Lanka are now moving forward. Chinese investment will finance a new tolled highway in Sri Lanka. The project for the US$1.5 billion tolled highway is being handled jointly by China Merchants Hua Jian Highway Investment Company and China Merchants Holdings (International) Company. The agreement is to build and operate the highway over a 25-30 year period, and which will be constructed in four separate phases. The first phase will be from Enderamulla to Ambepussa, with the second f
  • Serbia highway work commencing
    February 8, 2019
    Construction of the Preljina-Pozega section of Serbia’s Corridor 11 route is commencing in March 2019. The project is challenging due to the terrain and this section of the route will include 32 bridges, 11 overpasses, three tunnels and three interchanges. The work is itself being carried out in three sections. One 8.3km section runs from Preljina to Prijevor while there is an 15.5km section from Prijevor to Lucani and a 7km stretch joining Lucani with Pozega.
  • Ugandan affairs provide key connection
    February 29, 2012
    An upgrade to the road link connecting the cities of Kampala and Entebbe in Uganda will be funded by a loan worth US$350 million being provided by the Chinese Exim Bank.
  • Serbia highway projects moving ahead
    September 30, 2016
    Progress is being seen in Serbia with regard to some of the country’s key highway projects. The Ljig-Preljina stretch of the Corridor 11 highway will open for traffic at the end of October 2016. The highway route will be tolled but these will not be implemented until the start of 2017. Plans are also moving ahead for the ring road project for the capital, Belgrade. Meanwhile talks are being held with the European Investment Bank (EIB) over the new highway link to run from Nis, through Merdare and over the b