Skip to main content

AWPR road project receives Supreme Court go ahead

The US $ 637.36 million (£ 395mn) Aberdeen Western Peripheral Route (AWPR), a scheme that will see the construction of a trunk road around the outskirts of the northern Scottish city, has been given the go ahead by the Supreme Court. The scheme was green lighted after the Supreme Court dismissed objections filed by William Walton, the chair of the Road Sense campaign group. Walton claimed the government failed to comply with correct procedures when devising the route, which also includes a link between the
October 26, 2012 Read time: 1 min
The US $ 637.36 million (£ 395mn) Aberdeen Western Peripheral Route (AWPR), a scheme that will see the construction of a trunk road around the outskirts of the northern Scottish city, has been given the go ahead by the Supreme Court.

The scheme was green lighted after the Supreme Court dismissed objections filed by William Walton, the chair of the 6788 Road Sense campaign group. Walton claimed the government failed to comply with correct procedures when devising the route, which also includes a link between the new road and the town of Stonehaven. Work on the new road is expected to be completed in 2018.

For more information on companies in this article

Related Content

  • Skanska wins major A46 upgrade in England
    September 2, 2022
    Construction on the deal worth almost €404.5 million is scheduled to start in 2025.
  • A roundabouts way of lighting
    October 10, 2022
    One of Europe’s first smart lighting systems specifically for roudabouts is operating in Hungary and making big energy savings for local government, explains Miklós Muranyi*
  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow