Skip to main content

AVTODOR seeks another Moscow-St Petersburg motorway section bid

Russia's state highways agency AVTODOR has invited bids for construction of another section of the Moscow to St. Petersburg toll motorway. Starting cost of the bid to build the section from kilometre 58-149 is nearly US$1.2 billion. Investors will have to put up front 20% of the accepted bid cost to build the 91km section. Construction of the 700km motorway is being let in sections, with highly competitive bids coming from the major international players in highways infrastructure. In February 2014
December 18, 2014 Read time: 2 mins
Russia's state highways agency 3974 AVTODOR has invited bids for construction of another section of the Moscow to St. Petersburg toll motorway.

Starting cost of the bid to build the section from kilometre 58-149 is nearly US$1.2 billion. Investors will have to put up front 20% of the accepted bid cost to build the 91km section.

Construction of the 700km motorway is being let in sections, with highly competitive bids coming from the major international players in highways infrastructure.

In February 2014, 3260 World Highways reported that 2450 Mostotrest, owned by the Rotenberg brothers, won the tender for construction of the sixth and longest section of the highway. The 209km section, making up kilometre 334-543, will pass through the Tver and Novgorod regions. Construction cost is around US$4.5 billion. The road should be open prior to the 2018 1556 World Cup, with games to be played in 11 cities within Russia, including St Petersburg and the final in Moscow.

For more information on companies in this article

Related Content

  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • Algeria gives go ahead for 63km Guelma-Annaba motorway
    December 11, 2014
    Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
  • More Russian firms sanctioned over Kerch Strait Bridge work
    August 6, 2018
    The European Union has sanctioned more Russian companies involved in the construction of the Kerch Strait Bridge linking Russia with the Crimean Peninsula. Newly placed on the list – now 44 companies in all – are the three firms PJSC Mostotrest, SGM and Stroygazmontazh Most OOO controlled by billionaire Arkady Rotenberg, a close friend of Russian president Vladimir Putin. Others are construction firm CJSC VAD, engineering firm GPSM and the Zaliv Shipyard. Russia seized the Crimea region from the Ukrai
  • East Africa’s dream of a ‘Silk Road’ in sight
    October 22, 2021
    East Africa’s dream of a ‘Silk Road’ route to boost trade and transport is now in sight