Skip to main content

Autonomous road paving

Strabag handles autonomous road paving trial in Austria.
October 7, 2024 Read time: 3 mins
STRABAH has carried out trials of innovative autonomous road construction machines in Austria - image courtesy of STRaBAG

Contractor STRABAG has carried out a successful autonomous road paving trial in Austria. This used innovative technology and was tested in practice on the A9 motorway near Graz.

The trial section for robotised solutions and modularisation for part of an EU-wide research project, InfraROB. This aims to deliver automation technology to improve safety for workers and road users during road construction and maintenance works. Autonomous robotised machinery handles site barriers, road marking and asphalt surface repair.

STRABAG’s TPA competence centre and its partners in the EU-wide research project InfraROB has tested newly developed automation technology in practice during ongoing renovation works along the A9. The aim of the innovative solutions is to help improve the safety, efficiency and cost-effectiveness of road construction and maintenance works in the long term. For the past three years, a total of 15 companies and research institutes from eight different countries have been working on five InfraROB subprojects under the leadership of the University of Vigo, Spain.

A fully autonomous paver laid the asphalt on the 180m-long trial section near Spielfeld automatically, with implementation and logistics coordinated by a STRABAG team from Graz. Road operator and InfraROB partner ASFINAG provided the trial section. TPA and its three German partners in InfraROB Subproject 1 have thus achieved their central goal: the automatic control system that has now been developed is the missing piece for fully autonomous asphalt paving; it complements the innovative measurement and sensor technology that MOBA AG, TH Köln, TU Darmstadt and TPA had previously developed as part of the research project Robot – Road Construction 4.0 in Germany. The automation of asphalt paving could improve occupational health and safety on road construction sites in the long term, as Sebastian Czaja, Head of TPA Group PSS (Process Stability in Road Construction), points out: “In the future, paving staff will increasingly be performing the task of controller. They will be able to work at a greater distance from moving traffic, keeping them less exposed to vapours and aerosols during the paving process.”

MOBA (Mobile Automation) AG developed a special module for the autonomous control of the machinery that is connected directly to the digital CAN bus interface of the asphalt paver and feeds the machine with the target data for the paving section. Object recognition sensors and satellite navigation (GNSS) keep the paver dynamically on the right course during paving. A second innovation from InfraROB Subproject 1 is a newly developed paver attachment that was used to successfully integrate a sensor-equipped fibre optic cable (FOS cable) directly into the surface course during asphalt paving. The installed temperature and movement sensors further provide information about the load on the asphalt surface during use. In the future, this data can be used for the monitoring of road maintenance works.

Innovative robotics from the InfraROB project could automate further work processes on road construction sites in the future, significantly reducing the risk of accidents for both workers and road users. Mobile safety cone robots, for example, were used to segment the trial section: coordinated and networked by drone (RPAS), a swarm of autonomously moving pylons (cone robots) with object recognition sensors ensured a safe distance from moving traffic (Subproject 4). Following asphalt paving, small autonomous, three-wheeled robots with paint tanks will also mark the road at the end of October.

A similarly constructed mobile robot with a 3D print head was developed in the InfraROB subproject for road maintenance: The robot will use its 3D print head to autonomously repair potholes and cracks with a cold asphalt mixture. Modular prefabrication, meanwhile, aims to improve the cost-effectiveness of road construction projects: The InfraROB partners in Subproject 3 have developed multifunctional crash barrier modules that efficiently combine crash barrier, gutter, curb and rainwater channel in an all-in-one precast concrete component. The research project also developed models for integrating InfraROB solutions into pavement maintenance systems (PMS) and traffic management systems (TMS) to improve work and traffic safety (Subproject 5).

For more information on companies in this article

Related Content

  • Innovative, quality asphalt surfacing solutions
    February 22, 2012
    An array of innovative mix designs and special processes have been introduced to the paving market in recent years. These are now being used in many site applications and are offering contractors the benefits of fast application and high surface quality while providing safe, cost-effective and hard wearing solutions with long life for clients.
  • A new event is preparing the asphalt industry for tomorrow’s world
    September 11, 2018
    An inaugural event for the European bitumen industry urged attendees to look to the future - Kristina Smith reports What will tomorrow’s roads look like? Will lanes be narrower, will the road charge vehicles as they drive on them, will they collect data, will they be self-cleaning and de-polluting? All these questions and more were pondered at a two-day conference in Berlin, entitled ‘Preparing the asphalt industry for the future’. It was the first such event for Eurasphalt & Eurobitume (E&E), and set a
  • Novel twin layer paving technology saves time
    February 28, 2012
    German paver specialist Vögele reports that market acceptance is growing for its novel twin layer paving technology
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.