Skip to main content

Automated vehicle locators a must for Saudi Arabia taxis

Taxis in Saudi Arabia must equipped with an Automated Vehicle Locators (AVL) system, as part of new regulations set to be introduced on 22 October, 2012. The AVL will record the drop-off and pick-up location of the taxis as well as their driving speed. Taxi firms will also need to include minimum third-party insurance coverage for each driver and vehicle.
September 11, 2012 Read time: 1 min
Taxis in Saudi Arabia must equipped with an Automated Vehicle Locators (AVL) system, as part of new regulations set to be introduced on 22 October, 2012.

The AVL will record the drop-off and pick-up location of the taxis as well as their driving speed. Taxi firms will also need to include minimum third-party insurance coverage for each driver and vehicle. A US $ 53.33 fine will be imposed on taxi drivers failing the new regulations for the first time, while a $ 106.52 fine or driving license cancellation will be imposed on those found making multiple violations.

Meanwhile in Rwanda, to harmonise transport fares the 6544 Rwanda Utilities Regulatory Authority (RURA) is to introduce fix standard rates for special hire taxis. Meters will have to be installed by all taxi cabs under the tariff. The proposed tariff will see the tariff for one-day taxi rental at US $ 69.08, VAT exclusive. Airport taxi will be $0.81 per km and taxi operating in Kigali will be $ 0.69 per km.

For more information on companies in this article

Related Content

  • Boom times for SRL
    December 14, 2021
    SRL Traffic Systems has announced an exclusive partnership with barrier and gate manufacturer Solar Gates UK to hire out the manufacturer’s INSTABOOM work zone barriers.
  • Cost effective road maintenance
    February 7, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports
  • Concrete paving key to Berlin's airport runways
    February 17, 2012
    High production concrete paving is proving a key feature at the new Berlin airport facility currently under construction The new Berlin-Brandenburg International Airport will soon provide improved links by air to the city. Work started in mid 2006 with the redevelopment of the existing Berlin Schönefeld Airport.
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.