Skip to main content

Australian key link

Work is progressing according to plan on a key section of the Pacific Highway upgrade project in New South Wales (NSW) Australia.
March 5, 2012 Read time: 1 min
Work is progressing according to plan on a key section of the Pacific Highway upgrade project in New South Wales (882 NSW) Australia. TheUS$360 million work involves removing two highway bridges over Minjungbal Drive and building a 330m viaduct over Central Valley, located in the south part of Sexton Hill. The project also includes realignment work for Laura Street, which will be connected through a four-way intersection to meet with the current Pacific Highway and Short Street. The upgrade work will provide a new link with three lanes of traffic in either direction that features a speed limit of 100km/h.

For more information on companies in this article

Related Content

  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • Alberta funds more upgrades near Edmonton
    April 12, 2021
    The Canadian province will move ahead with work on Highway 15 and 19.
  • New highway tender for Chile’s capital
    July 26, 2013
    The tender process is commencing for the Américo Vespucio Oriente expressway (AVO) in Chilean capital Santiago. The US$940 million tender is due to be awarded in February 2014. The 9km highway link will connect El Salto with Príncipe de Gales Avenue and will feature three lanes running in either direction, with a design speed of 80-100km/h. An underground section of this urban highway looks likely to be constructed using the New Austrian Tunnelling Method (NATM) while it may also include a section in an ope
  • Giving four hours back to the day… and much more
    October 7, 2019
    A 20km long elevated expressway in Dhaka will be one of Bangladesh’s first Public Private Partnership transport projects – words and pictures by Ruby Kitching, on behalf of Mott MacDonald.