Skip to main content

Australian key link

Work is progressing according to plan on a key section of the Pacific Highway upgrade project in New South Wales (NSW) Australia.
March 5, 2012 Read time: 1 min
Work is progressing according to plan on a key section of the Pacific Highway upgrade project in New South Wales (882 NSW) Australia. TheUS$360 million work involves removing two highway bridges over Minjungbal Drive and building a 330m viaduct over Central Valley, located in the south part of Sexton Hill. The project also includes realignment work for Laura Street, which will be connected through a four-way intersection to meet with the current Pacific Highway and Short Street. The upgrade work will provide a new link with three lanes of traffic in either direction that features a speed limit of 100km/h.

For more information on companies in this article

Related Content

  • More on the Newmarket Viaduct replacement
    June 15, 2012
    When it was completed in 1965 – just six years after the Auckland Harbour Bridge – the six-lane Newmarket Viaduct with its tall, slender piers was something of an engineering wonder, the first of its kind in the Southern Hemisphere. Forty years on it had become a much-maligned contributor to Auckland’s chronic traffic congestion, too weak seismically to withstand the heaviest loaded trucks let alone a severe earthquake, so narrow in the shoulders that any accident stopped traffic flow and made it difficult
  • Bolivian highway project progressing
    September 8, 2021
    Progress is being seen on a key Bolivian highway project.
  • Athabasca’s Hwy 813 bridge to be replaced
    May 16, 2022
    The new bridge over the Athabasca River in the Canadian province of Alberta will include two 3.7m-wide lanes with 1.8m-wide shoulders on either side as well as a pedestrian sidewalk.
  • Santiago’s Autopista Central in line for improvements
    June 18, 2015
    Motorway operator Autopista Central de Chile (AC) has applied to the Ministry of Public Works to make improvements worth around US$340 million to the Autopista Central system in the capital Santiago. Improvements are scheduled for the Quilicura area. AC will present an environmental impact and engineering study this summer to the ministry. Much of the work will take place at night time to avoid traffic disruption. Autopista Central consists of two highways, the westernmost of which branches off from t