Skip to main content

Ausa launches C 250 H rough-terrain forklift at INTERMAT 2012

The two Ausa forklifts shown at INTERMAT will feature the company’s FullGrip drive technology, which enables alternate use of 4x4 and 4x2, by pressing a button on its single-control joystick.
February 3, 2012 Read time: 1 min
Ausa’s new C 150 H
The two 2188 Ausa forklifts shown at INTERMAT feature the company’s FullGrip drive technology, which enables alternate use of 4x4 and 4x2, by pressing a button on its single-control joystick.

Two models from the range will be exhibited: the C 150 H and the C 250 H 4x4, with 1,500 and 2,500 kg loading capacity respectively.
 
The new FullGrip feature has been designed to increase the machine’s productivity as well as reducing emissions and fuel consumption when the situation does not require the 4x4 capability.

Ausa is also presenting what it claims are the world’s first quick-coupling forks for rough-terrain forklifts, as it enables attachments to be exchanged in a similar way to telehandlers.

%$Linker: External 0 0 0 oLinkExternal www.ausa.com Ausa false http://www.ausa.com/ false false%>

Outside: E6 Stand: A048

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • Lintec presents new Gussasphalt plant for the European Market
    January 6, 2017
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
  • Lintec presents new Gussasphalt plant for the European Market
    April 12, 2012
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
  • INTERMAT launch for tracked pump
    January 6, 2017
    The BSC 1409 D from Putzmeister is a self-propelled concrete pump designed specifically for concreting drilled piles on unfinished surfaces. In contrast to using truck-mounted concrete pumps for concreting drilled piles, it does not need supports to be set up each time it changes location. Compared to concreting with a delivery pipe, placement speed with the tracked concrete pump is now said to be considerably higher.
  • INTERMAT launch for tracked pump
    April 12, 2012
    The BSC 1409 D from Putzmeister is a self-propelled concrete pump designed specifically for concreting drilled piles on unfinished surfaces. In contrast to using truck-mounted concrete pumps for concreting drilled piles, it does not need supports to be set up each time it changes location. Compared to concreting with a delivery pipe, placement speed with the tracked concrete pump is now said to be considerably higher.