Skip to main content

Atlas Copco for Brazil bridge demolition

Brazilian demolition specialist Comprex was chosen to demolish a bridge connecting districts in the city of Vitória in the state of Espirito Santo. For environmental reasons, debris was not permitted to fall into the waterway under the bridge, and special arrangements had to be made for the removal of the demolition waste. Comprex chose Atlas Copco hydraulic breakers and CombiCutters for the jobsite where three new bridges have been built over the old bridge, which was no longer able to support the increasi
July 2, 2013 Read time: 2 mins
Bridge demolition under way in the city of Vitória, Brazil
Brazilian demolition specialist Comprex was chosen to demolish a bridge connecting districts in the city of Vitória in the state of Espirito Santo.

For environmental reasons, debris was not permitted to fall into the waterway under the bridge, and special arrangements had to be made for the removal of the demolition waste.

Comprex chose 161 Atlas Copco hydraulic breakers and CombiCutters for the jobsite where three new bridges have been built over the old bridge, which was no longer able to support the increasing volume of traffic crossing between the city districts. The old bridge, comprising 1,300m3 of reinforced concrete, needed to be removed, and an Atlas Copco SB 452 hydraulic breaker was used to remove the light structures, such as the parapet and concrete surfacing.

Two Atlas Copco MB 1700 hydraulic breakers and two CC 1700 CombiCutters, mounted on 2394 Volvo EC 210 and Cat 416E carriers, were used for the heavier task of removing the concrete layer from the beams and finally the ten beams themselves.

Demolition debris was received in a special boat and transported to a recycling plant.

“The MB 1700 and SB 452 hydraulic breakers gave impressive performance on the very hard concrete,” said Ronaldo Zucchi, owner of Comprex.

For more information on companies in this article

Related Content

  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • MB drum cutter unit for demolition project in Mexico
    February 6, 2018

    A structure in Mexico City, Mexico’s busy capital, has been demolished with assistance from a 283 MB Crusher units, The MB-R800 drum cutter was operated by Pilotec, a Mexican contractor commissioned to do the work.

  • MB 750 'aims to meet market demand'
    March 1, 2012
    Atlas Copco says the latest addition to its medium breaker range, the MB 750 hydraulic breaker, is aimed at meeting the major market demand of reducing the lifecycle cost of machinery and tools. "Two-thirds of the lifecycle cost of a breaker is made up by factors such as operator cost, energy and fuel consumption, as well as service and maintenance costs," says Atlas Copco.
  • Riga's newest bridge improved traffic flow
    April 11, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List.