Skip to main content

Atlas and Mantsinen announce strategic partnership

German company Atlas Maschinen and Finnish group Mantsinen have formed a new strategic partnership that will include technical cooperation covering the manufacturing of hydraulic material-handling machines and R&D. Atlas has its head office in Delmenhorst and plants in Ganderkesee and Vechta, while Mantsinen’s principal place of business is in Ylämylly, Finland.
January 6, 2017 Read time: 2 mins
German company 2346 Atlas Maschinen and Finnish group 7290 Mantsinen have formed a new strategic partnership that will include technical cooperation covering the manufacturing of hydraulic material-handling machines and R&D.

Atlas has its head office in Delmenhorst and plants in Ganderkesee and Vechta, while Mantsinen’s principal place of business is in Ylämylly, Finland.

The aim of this cooperation is to enhance and complete the product offering of both companies, which will continue sales through their existing distribution channels.

Fil Filipov, owner and chairman of Atlas Maschinen said, “This is a natural fit for our business on many levels. Our existing customers have increasing needs for larger high-quality material-handling machines and there’s a further fit with our engineers and the technology the Mantsinen equipment utilises.

“The concept of Mantsinen hydraulic material handlers is perfect for the needs of our customers. It offers a viable, quick and cost-effective alternative to traditional mobile cranes with rope. In addition, this cooperation strengthens further our offering of electric-powered machines.”

Mantsinen Group managing director Martti Toivanen said, “We are delighted to have this cooperation with Atlas. Its knowledge, presence and reputation in the machinery industry is impressive, as is the control over its design, R&D and manufacturing.”

Stand: F7.710/711

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 49159 0 oLinkExternal www.AtlasGmbH.com www.AtlasGmbH.com false /EasySiteWeb/GatewayLink.aspx?alId=49159 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Advanced high reach capability from Haulotte’s latest access plaform
    January 31, 2013
    According to Haulttoe, its new HT 23 RTJ platform offers a wider working envelope than previous designs in its size class. Platform working height is 22.5m, while its horizontal outreach is 18.3m, around 1m higher than competing units. A dual load system is available as an option, allowing a lifting capacity up to 450kg while the machine is said to offer a high lifting speed, taking just 56 seconds to reach full height and increasing its productivity in this product segment. It also offers high manoeuvrabi
  • Alpha 330 drilling tool system from Sandvik
    January 6, 2017
    Sandvik Construction is launching its new Alpha 330 drilling tool system for drilling and tunnelling. It has been developed with special features that control power and ensure this power is transmitted into the rock as efficiently, accurately and economically as possible. The company says that in tests, in varying rock conditions, the new design has been proven to deliver a 30-80% increase in rod life; provide more accurate collaring and straighter blast-holes, thereby delivering greater advancement and imp
  • Alpha 330 drilling tool system from Sandvik
    February 13, 2013
    Sandvik Construction is launching its new Alpha 330 drilling tool system for drilling and tunnelling. It has been developed with special features that control power and ensure this power is transmitted into the rock as efficiently, accurately and economically as possible. The company says that in tests, in varying rock conditions, the new design has been proven to deliver a 30-80% increase in rod life; provide more accurate collaring and straighter blast-holes, thereby delivering greater advancement and imp
  • Goldhofer rescues O&K RH 120-E from Calenturitas de Prodeco Mine
    November 1, 2016
    It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia. The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth. So the mining company contracted heavy haulage specialist Boom Logistics to collect the excavator and transport it to the repair shop 22km away. http://www.goldho