Skip to main content

Atkins secures Oklahoma DOT construction management services role

Atkins has secured a new US$7.5 million two-year contract to provide statewide construction management (CM) services to the Oklahoma Department of Transportation (ODOT). The contract will see Atkins continue to manage statewide construction projects for ODOT, as it has done since 2009. As part of its previous CM contracts, Atkins oversaw construction efforts for several bridges, as well as for urban projects in four ODOT field divisions. Atkins also managed stimulus-funded projects for roadway rehabilitatio
December 5, 2012 Read time: 2 mins
3005 Atkins has secured a new US$7.5 million two-year contract to provide statewide construction management (CM) services to the 5295 Oklahoma Department of Transportation (ODOT).

The contract will see Atkins continue to manage statewide construction projects for ODOT, as it has done since 2009. As part of its previous CM contracts, Atkins oversaw construction efforts for several bridges, as well as for urban projects in four ODOT field divisions.

Atkins also managed stimulus-funded projects for roadway rehabilitation, ADA upgrades and safety improvements, laying fibre-optic cable, installing more than 400 new LED traffic-signal heads, and upgrading street lights by installing more than 100 new decorative roadway luminaries.

“It’s an honour to be chosen by ODOT for our third consecutive two-year contract,” said Jim Hunt, Atkins’ Oklahoma district project director. “Winning this important contract reflects the confidence and trust our personnel have established through their dedication to quality and hard work with ODOT over the past four years.”

In addition to the CM work Atkins provides ODOT, the company is working on a utility-relocation coordination contract in support of ODOT’s eight-year plan to improve highways and bridges statewide.

Its multiple contracts are said to have enabled Atkins to expand its office in Norman, Oklahoma; and the company is now planning to open an office in Tulsa.

For more information on companies in this article

Related Content

  • Easing temporary highway danger
    February 22, 2013
    Some of the latest speedometer technology has been successfully trialled in French highway work zones, while tireless work continues across Europe and the United States to reduce the number of work zone deaths and serious injuries involving road workers and motorists. Guy Woodford reports The number of roadworkers being killed and seriously injured on England’s motorways and major trunk roads more than doubled between 2007 and 2010 – from no deaths and 14 serious injuries. This rise has led to to major camp
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Case on the case in Iceland with its 695ST backhoe loader
    March 21, 2016
    Gröfuþjónusta Steins, a contractor in southern Iceland, has taken delivery of a CASE 695ST backhoe loader from newly appointed sub-dealer Vélaborg Vörumeðhöndlu. Gröfuþjónusta Steins, based in Selfoss, a town on the banks of the Ölfusá river, is involved in a range of projects, including highway construction projects and the installation of fibre optic cables, telecommunications wiring and utility pipes for heating and water. It also provides specific services including snow clearing services. The company,
  • Lighting innovations boosting brightness, cutting costs
    January 27, 2014
    CU Phosco’s new P850 LED main road lantern has just seen its first major deployment – between Junctions 16 and 17 of the A55, a strategic road which skirts the North Wales coastline – Jason Barnes reports The A55 is a grade-separated dual carriageway also known as the North Wales Expressway. Some 139km long, it originally ran from Chester to Bangor but was extended across the Isle of Anglesey into Holyhead Docks in 2001 under a project part-funded by the European Union.