Skip to main content

Asphalt education from technical course

A special course being held at Newcastle University in the UK is intended to help road construction professionals with knowledge on asphalt road paving. The course is being managed by Roger N Bird, Senior Lecturer in Highway Engineering at Newcastle University. The course will run from the 3rd September to the 7th September 2018 at the university. This course is being run by Newcastle University’s Transport Operations Research Group.
July 5, 2018 Read time: 1 min
A special course being held at 5161 Newcastle University in the UK is intended to help road construction professionals with knowledge on asphalt road paving. The course is being managed by Roger N Bird, Senior Lecturer in Highway Engineering at Newcastle University. The course will run from the 3rd September to the 7th September 2018 at the university. This course is being run by Newcastle University’s Transport Operations Research Group.


Further details can be found at: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.ncl.ac.uk/ false http://www.ncl.ac.uk/ false false%>

For more information on companies in this article

Related Content

  • Palfinger launches 30m truck-mounted platform
    January 6, 2017
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.
  • Palfinger launches 30m truck-mounted platform
    April 19, 2012
    Palfinger Platforms has replaced its TKA series access platform with the P300KS. Mounted on a 7.5 tonne truck chassis, the P300KS has a working height of 30m with a maximum outreach to the side or the back of 20.5m. The cage, which offers 540 degrees of rotation, has a maximum load of 350kg.
  • Brazil: contractors fear more layoffs as DNIT fails to pay up
    November 25, 2014
    The head of Brazil’s association of road constructors has warned of more layoffs unless the National Department of Infrastructure and Transport (DNIT) starts paying its contractors. Jose Alberto Pereira Ribeiro, president of ANEOR – National Association of Road Works - said companies already have been forced to lay off around 1,700 workers in light of non-payment by the government. Another 950 employees are on forced holidays. Ribeiro claimed DNIT failed to meet its financial obligations for September
  • DAT’s speedy and reliable dataloggers
    January 6, 2017
    DAT instruments is a leading manufacturer of dataloggers for geotechnical activities and special foundations. The company, whose dataloggers are suitable for use in applications relating to jet grouting; grouting; cement injection; drilling; MWD; CFA; soil mixing; vibroflotation; diaphragm walls; Lugeon tests; and mineral investigation. Product reliability and company service are said to be among DAT instruments key priorities.