Skip to main content

Ascorel introduces MC602 anti-collision system at INTERMAT 2012

Ascorel’s systems for preventing crane collisions can now manage mobile as well as tower cranes. The new version of the MC602 has been designed for optimised management of mobile cranes. The latest developments focus on the automation of the machine positioning and on the optimisation of cranes’ workspaces.
January 6, 2017 Read time: 2 mins
The new version of the MC602 has been designed for optimised management of mobile cranes.
2197 Ascorel’s systems for preventing crane collisions can now manage mobile as well as tower cranes.

The new version of the MC602 has been designed for optimised management of mobile cranes. The latest developments focus on the automation of the machine positioning and on the optimisation of cranes’ workspaces.

When moving a mobile crane, the coordinates of the new position are filed in its anti-collision system and are then automatically transmitted to all the machines around. Ascorel said that this leads to savings of up to several hours for each repositioning of a machine on site. It has been designed to reduce human intervention, increase accuracy and reduce the operating cost of the system. The development is now allowing Ascorel to consider real-time positioning of mobile cranes on construction sites using GPS technology.

Ascorel said that the system now allows one or more tower crane jibs to safely overfly the mobile crane. It automatically secures the boom of the mobile crane when it is telescoped. The system has also been designed to manage the avoidance of collision with the surrounding machines without the need for reprogramming.
 
 The large display screen has been developed to inform the site of the wind speed in real-time. Ascorel also offers beacons to ensure safe air navigation around the cranes.

%$Linker: External 0 0 0 oLinkExternal www.ascorel.com Ascorel false http://www.ascorel.com/ false false%>

%$Linker: 2 Internal 2 4824 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/intermat-2012/video/ true false%>

For more information on companies in this article

Related Content

  • BI Conseil shows INTERMAT 2012 how Swiss watches can save lives
    February 3, 2012
    BI Conseil is aiming for Swiss watches to become as standard as hard hats in preventing injury on site.
  • Terex’s ‘superstructure’
    January 6, 2017
    The 100tonnes capacity class Roadmaster 5300 Truck Mounted Crane is said by Terex to have an innovative superstructure and outrigger frame which allows it to be mounted on a commercially-built, rather than a custom, five-axle truck chassis.
  • Terex’s ‘superstructure’
    March 1, 2012
    The 100tonnes capacity class Roadmaster 5300 Truck Mounted Crane is said by Terex to have an innovative superstructure and outrigger frame which allows it to be mounted on a commercially-built, rather than a custom, five-axle truck chassis.
  • Boom time at JLG
    January 6, 2017
    Unveiled as a prototype at SAIE, Italy in October 2010, the compact 340AJ boom lift can cope with grades and break-over angles up to 45° allowing it to drive on slopes and up ramps. Built to a working height of 12.35metres and with a horizontal outreach of 6.07metres, the 340AJ is said by JLG to meet demands for a broad range of applications. The jib extends to 1.2metres with near vertical operation. When ground conditions get tough, proper off-road performance is ensured by the standard oscillating axle an