Skip to main content

Arteris of Brazil plans to spend up to US$2.26bn by 2017

Brazil motorway concessionaire Arteris, formerly OHL Brasil, could spend up to US$2.26 billion (BRL 4.5bn) by 2017, instead of an initially planned BRL 3.5 billion. The company is to turn Serra do Cafezal (Rodovia Regis Bittencourt) and BR-101 in Rio de Janeiro into dual carriageways, in addition to Autopista Fluminense and Autoposta Litoral Sul. Arteris says it has a BRL 1.8 billion loan from national development bank BNDES to help with its investments. However, the company says it plans to raise some BRL
January 31, 2013 Read time: 1 min
Brazil motorway concessionaire 7126 Arteris, formerly 980 OHL Brasil, could spend up to US$2.26 billion (BRL 4.5bn) by 2017, instead of an initially planned BRL 3.5 billion. The company is to turn Serra do Cafezal (Rodovia Regis Bittencourt) and BR-101 in Rio de Janeiro into dual carriageways, in addition to Autopista Fluminense and Autoposta Litoral Sul.

Arteris says it has a BRL 1.8 billion loan from national development bank BNDES to help with its investments. However, the company says it plans to raise some BRL 700 million more.

For more information on companies in this article

Related Content

  • Brazilian project attracts strong interest
    April 30, 2012
    Interest is strong in Brazil’s BR-101 highway project. The tender for the project will open on 18th January 2012. According to Brazil's Land Transport Agency (ANTT), at least six groups, most Brazilian, have shown interest in the project. The stretch to be put out to tender totals 476km, of which 458km is in Espirito Santo. The ANTT states that US$1.24 billion will be invested in the BR-101, with plans to widen the highway in stages. The concession period for the road totals 25 years and the highway will fe
  • OHL presents offer for Guadalajara-Colima, Mexico motorway
    September 7, 2012
    Spanish construction firm, OHL, has presented an offer to operate the 56km Guadalajara-Colima motorway in Mexico for 12 years. The motorway is being heavily restructured, with the expansion of its four lanes. The first phase of these works has already been completed and investment to date has totalled US $ 54.81million. A further $ 263.66 million is being invested by Banobras on current works. Offers to operate the Guadalajara-Colima motorway must be presented by mid-September 2012.
  • New Pakistan motorway routes
    November 12, 2024
    New Pakistan motorway routes will be built under the PPP model.
  • Motoring groups critical over plans for Britain’s second toll motorway
    April 3, 2013
    Motoring groups have criticised plans to launch Britain’s second toll motorway as part of a multi-billion euro road –building programme to kick-start the economy. The Treasury is expected to guarantee the €1.18 billion (£1bn) borrowing costs for the Welsh government to pay for the construction of the new 14-mile M4 relief road in South Wales. The money for the dual carriageway, which will run between junctions 23 and 29 of the M4 and aims to reduce bottlenecks at the Byrnglas Tunnels near Newport, is then l