Skip to main content

ARTBA PPP awards include key Texas project

A $1.2 billion highway project in North Central Texas was recognised as a prime example of innovative transportation financing at an event held by the American Road & Transportation Builders Association (ARTBA). The 26th Annual Public Private Partnership (P3) Conference in US capital Washington was organised by ARTBA with its P3 Awards being presented in two categories, for entrepreneur of the year and project of the year. The former is given to at least one individual who has made an outstanding contributi
July 22, 2014 Read time: 2 mins

A $1.2 billion highway project in North Central Texas was recognised as a prime example of innovative transportation financing at an event held by the 920 American Road & Transportation Builders Association (ARTBA). The 26th Annual Public Private Partnership (P3) Conference in US capital Washington was organised by ARTBA with its P3 Awards being presented in two categories, for entrepreneur of the year and project of the year. The former is given to at least one individual who has made an outstanding contribution to the forward progress of P3s in the US transportation industry. Meanwhile the latter highlights a project that demonstrates the value P3s bring to the US transportation development. 

The Entrepreneur of the Year Award was presented to Russell Zapalac, a 30-year veteran of transportation project delivery. Zapalac is chief planning and project officer at the 3499 Texas Department of Transportation (TxDOT). He convinced state policymakers to incrementally expand TxDOT’s authority to use P3s and Design-Build as innovative delivery methods. Today, the agency has $2.5 billion in P3 projects in operation, $12 billion under construction, and nearly $4 billion in contracts pending.  The P3 Project of the Year award was given to the Dallas Fort-Worth (DFW) Connector in Texas. The massive highway expansion and reconstruction project features 24 lanes, including 14 main lanes, six frontage road lanes and four managed toll lanes with dynamic pricing allowing traffic to flow at 80km/h through one of the state’s most congested areas. The project team included: TxDOT; 2418 HDR; 1662 Jacobs; 4137 KPMG; Nossaman; NorthGate Constructors (a joint venture of Kiewit and Zachry Construction); and 2693 Parsons Brinckerhoff. The DFW’s innovations in procurement, management, logistics & planning, and other efficiencies resulted in the project being completed six months ahead of schedule with savings of $140 million.

Related Content

  • ARTBA makes awards
    February 29, 2012
    A series of highway and bridge projects across the US have been recognised for their contributions to environmental protection and mitigation.
  • Upgrades underway for Tarrant tollway in Texas
    September 20, 2013
    Financing has been found to fund construction work on the North Tarrant Express (NTE) in Texas. The public-private partnership project for Segment 3A of the route will be carried out by NTE Mobility Partners Segments 3 LLC (NTEMP3). The rebuilding of the I-35W road close to Fort Worth will help reduce traffic congestion on the route at peak periods. The public-private partnership has been agreed between NTEMP3, the Texas Department of Transportation (TxDOT) and the North Central Texas Council of Governments
  • Atkins is working on major deals for Texas and Florida
    March 10, 2014
    Atkins is working on major contracts in Texas and Florida for tolling and design and build services respectively. In Texas the Department of Transportation (TxDOT) reselected Atkins as its state-wide prime consultant for toll-plaza planning, development, and implementation. Under the terms of the five-year, $10 million contract, Atkins is providing planning, development, infrastructure design and coordination, and construction oversight services, as well as system installation, integration, and testing serv
  • Texas contract awarded to joint venture
    March 31, 2022
    A major Texas road contract has been awarded to a joint venture team.