Skip to main content

Arcadis for Calcasieu Bridge replacement work

Replacement of the 70-year-old Calcasieu River Bridge in the US state of Louisiana will revive a connection between the cities of Lake Charles and Westlake.
By David Arminas June 12, 2025 Read time: 2 mins
The 2km-long Calcasieu River Bridge, opened in 1952, is an arched cantilever, rivet-connected Warren through truss for the main span located on Interstate 10 between Lake Charles and Westlake (image © Typhoonski/Dreamstime)

Arcadis has been appointed to support the design work for the I-10 Calcasieu Bridge Improvements Project in the US state of Louisiana.

The replacement of the 70-year-old Calcasieu River Bridge will revive a vital connection between the Louisiana cities of Lake Charles and Westlake. With a project cost valued at US$2.3 billion, the Calcasieu Design Partners will upgrade a crucial 9km stretch of I-10, delivering enhancements to improve safety, connectivity and sustainability.

The 2km-long Calcasieu River Bridge, opened in 1952, is an arched cantilever, rivet-connected Warren through truss for the main span located on Interstate 10 between Lake Charles and Westlake. “The Calcasieu River Bridge has served the region for 70 years, but as it nears the end of its lifespan, the need for intelligent, modern and sustainable solutions is more critical than ever,” said Alan Brookes, chief executive of Arcadis.

Arcadis is working as part of a joint venture with Janssen and Spaans Engineering, Modjeski and Masters as well as Huval and Associates – collectively known as the Calcasieu Design Partner. The team will support Louisiana Bridge Builders, a construction joint venture between Arcadis’ key client Acciona and Sacyr Construction.

The project is overseen by the concessionaire, Calcasieu Bridge Partners (Acciona, Sacyr and Plenary), in collaboration with the Louisiana Department of Transportation and Development, also a key client of Arcadis.

Over eight years, Arcadis’ will update existing interchanges and roadways. Pulling on expertise from across North America, the Netherlands and the company’s Global Excellence Centers in India, Romania and the Philippines, Arcadis will deliver a range of specialised intelligent mobility, engineering and design services.

These include traffic engineering, including the development of a transportation management plan and the design of permanent signage, signals and pavement markings. There will be structural design work for sign support structures, roadway and drainage as well as bridge design for the I-10/I-210 flyover ramp and hydraulic modeling for the main span bridge.

Related Content

  • US$190 million Florida road deal for Webuild
    October 28, 2024
    A US$190 million Florida road deal has been won by Webuild.
  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • Thailand’s widest river bridge on track
    May 26, 2022
    Thailand’s widest river bridge is on track for completion.
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en