Skip to main content

Arcadis for Calcasieu Bridge replacement work

Replacement of the 70-year-old Calcasieu River Bridge in the US state of Louisiana will revive a connection between the cities of Lake Charles and Westlake.
By David Arminas June 12, 2025 Read time: 2 mins
The 2km-long Calcasieu River Bridge, opened in 1952, is an arched cantilever, rivet-connected Warren through truss for the main span located on Interstate 10 between Lake Charles and Westlake (image © Typhoonski/Dreamstime)

Arcadis has been appointed to support the design work for the I-10 Calcasieu Bridge Improvements Project in the US state of Louisiana.

The replacement of the 70-year-old Calcasieu River Bridge will revive a vital connection between the Louisiana cities of Lake Charles and Westlake. With a project cost valued at US$2.3 billion, the Calcasieu Design Partners will upgrade a crucial 9km stretch of I-10, delivering enhancements to improve safety, connectivity and sustainability.

The 2km-long Calcasieu River Bridge, opened in 1952, is an arched cantilever, rivet-connected Warren through truss for the main span located on Interstate 10 between Lake Charles and Westlake. “The Calcasieu River Bridge has served the region for 70 years, but as it nears the end of its lifespan, the need for intelligent, modern and sustainable solutions is more critical than ever,” said Alan Brookes, chief executive of Arcadis.

Arcadis is working as part of a joint venture with Janssen and Spaans Engineering, Modjeski and Masters as well as Huval and Associates – collectively known as the Calcasieu Design Partner. The team will support Louisiana Bridge Builders, a construction joint venture between Arcadis’ key client Acciona and Sacyr Construction.

The project is overseen by the concessionaire, Calcasieu Bridge Partners (Acciona, Sacyr and Plenary), in collaboration with the Louisiana Department of Transportation and Development, also a key client of Arcadis.

Over eight years, Arcadis’ will update existing interchanges and roadways. Pulling on expertise from across North America, the Netherlands and the company’s Global Excellence Centers in India, Romania and the Philippines, Arcadis will deliver a range of specialised intelligent mobility, engineering and design services.

These include traffic engineering, including the development of a transportation management plan and the design of permanent signage, signals and pavement markings. There will be structural design work for sign support structures, roadway and drainage as well as bridge design for the I-10/I-210 flyover ramp and hydraulic modeling for the main span bridge.

Related Content

  • Western nations need to maintain roadway assets
    December 23, 2014
    In the western world, drivers have benefited over many years from road and highway networks connecting not just towns and cities, but remote rural areas also. The US Interstate network in particular shows how major investment in infrastructure can help fuel economic growth. Construction of the Interstate system commenced in 1956, with the new highways that were built and the transportation they provided contributing greatly to the economic power of the US ever since. In Western Europe too, highway links pro
  • New bridge link from Cameroon to Chad
    August 1, 2016
    Plans are in hand for a new bridge between Cameroon and Chad. The new bridge will be built to improve the road connection between Yagoua in northern Cameroon and Bongor in Chad. It will cross the Logone River, which forms a stretch of the border between the two countries from Lake Chad and running to the south of Bongor. The work is expected to cost around US$127 million. The authorities in both countries are involved with the planning for the new bridge as there is a recognition in both nations that improv
  • Tenders in for Budapest’s Chain Bridge
    September 17, 2020
    Work on the 19th century Széchenyi Chain Bridge could start in March.
  • Kontent Structures has it covered
    October 15, 2021
    Renovation on a bridge over the Rhine River in Karlsruhe, Germany, has been completed using a weather-resistant tent covering the entire length of the structure