Skip to main content

Antwerp project cost spirals to €10.1 billion

The Antwerp Oosterweel project cost has spiralled to €10.1 billion.
By MJ Woof November 1, 2024 Read time: 1 min
Antwerp in Belgium will benefit greatly from its new road link when complete but the project has been hit by major cost increases -= image courtesy of © Arvelius| Dreamstime.com


A huge increase in cost has been seen for the Oosterweel link project in Antwerp, Belgium. The Oosterweel route is providing an improved connection between the Expressweg (E34) through a tolled tunnel running underneath the Scheldt and a twin deck tunnel under the Albert Canal to the Antwerp Ring Road.

The project was originally expected to cost €6.8 billion but the cost has now spiralled to €10.1 billion due to a number of factors. These factors include increased costs for materials and labour since the COVID 19 pandemic as well as unforeseen technical challenges and the need for additional pollution measures.

Construction commenced in 2017 and should be complete by 2033.

 

Related Content

  • New tunnel planned for Serbia
    February 23, 2015
    In Serbia plans are being drawn up for a new tunnel project. The planned route for the road tunnel would run under the mountain of Kadinjaca and connect the towns of Uzice and Bajina Basta. The plans are being drawn up by the Regional Development Agency Zlatibor, with tendering due for a feasibility study into the project. Funding looks set to be provided from European sources with some €176,000 to cover all the necessary project documentation and the paperwork should be ready by the end of 2016. The estima
  • Investing in East Africa's road sector to boost economic development
    April 14, 2020
    Investments in East Africa’s road sector are helping drive economic development as well as political stability
  • Polish capital route project being planned
    September 9, 2019
    Route reviews are being carried out for a key Polish project. Poland’s highways authority, GDDKiA, is analysing the four potential routes for the S10 road, which will connect with Warsaw’s outer ring road, itself still to be completed. The different routes have estimated costs ranging from €5.34 billion to €5.99 billion and all connect with the A1, though at different intersections. Financing for the work should be secured by 2020, with tendering expected in 2025 and construction due to commence in 2026.
  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi