Skip to main content

Antwerp project cost spirals to €10.1 billion

The Antwerp Oosterweel project cost has spiralled to €10.1 billion.
By MJ Woof November 1, 2024 Read time: 1 min
Antwerp in Belgium will benefit greatly from its new road link when complete but the project has been hit by major cost increases -= image courtesy of © Arvelius| Dreamstime.com


A huge increase in cost has been seen for the Oosterweel link project in Antwerp, Belgium. The Oosterweel route is providing an improved connection between the Expressweg (E34) through a tolled tunnel running underneath the Scheldt and a twin deck tunnel under the Albert Canal to the Antwerp Ring Road.

The project was originally expected to cost €6.8 billion but the cost has now spiralled to €10.1 billion due to a number of factors. These factors include increased costs for materials and labour since the COVID 19 pandemic as well as unforeseen technical challenges and the need for additional pollution measures.

Construction commenced in 2017 and should be complete by 2033.

 

Related Content

  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Philippines bridge project – funding secured
    June 23, 2022
    Funding has been secured for a bridge project in the Philippines.
  • Solving congestion in Brisbane
    August 2, 2012
    Rapid growth in a major Australian city in recent years has created new problems for the infrastructure and especially transport Expansion in the city of Brisbane, the Queensland state capital and the third largest city in the country, is set to continue and some 1,500 people arrive/week from within Australia and from other parts of the world. At this rate by 2026 the city's population should increase by 1.4 million: at present it is 1.8 million. To cope, the Queensland government and city council have ini
  • Planned project progressing in Peru
    February 1, 2016
    Plans are progressing on a major tunnel project in Peru. The concession for the La Molina tunnel project in Lima has been awarded to Spanish firm OHL. The project will cost US$521 million. The 12.2km project includes building the 1.5km tunnel as well as sections of road and a number of viaducts. The new route will connect the districts of La Molina and Miraflores and will run through Surco, Surquillo and San Borja. OHL Concesiones Peru will carry out the technical studies for the project in 2017. Constructi