Skip to main content

Another US$94.08mn for repairs to Hammersmith flyover in London

A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
June 14, 2013 Read time: 2 mins
A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England.

2387 Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.

The latest work will take the total spent on maintaining it to at least $109.75 million (£70mn). The latest work will be carried out by the construction and civil engineering firm 2319 Costain.

Hammersmith flyover, which carries the A4 over Hammersmith and is used by 90,000 vehicles daily, will be subject to overnight lane closures, but engineers are confident there will be no need for weight restrictions.

Only last month, Hammersmith & Fulham Council (HFC) backed an expensive ‘flyunder’ tunnel as an alternative route into London from the west, but works could cost at least $392 million (£250mn) to complete.

Speaking recently on the long-running Hammersmith flyover safety saga, HFC council leader Nick Botterill reportedly said, “We know that vital repairs are necessary to the flyover but this needs to be the last time TfL spends a huge amount of taxpayers’ money on maintaining this monstrosity. Any other cash set aside for future work to the flyover needs instead to be pumped into making the flyunder a reality.

“A new tunnel solution would dramatically improve the quality of life for thousands of west Londoners and link the riverfront with Hammersmith town centre for the first time since the 60s.”

For more information on companies in this article

Related Content

  • UK motorway upgrade underway
    December 14, 2015
    A fleet of Hitachi short-tailswing excavators have been working on the M3 smart motorway project in the counties of Hampshire and Surrey in England. Eight ZX135US-5 and ZX225USLC-5 excavators owned by Skyland Drainage Contractors, and a further two ZX225USLC-5s owned by Davey Civils, have been employed on the subcontractors’ drainage works. Having previously hired Zaxis excavators, Kent-based Davey Civils has been a Hitachi customer for one year. Both models were supplied with service contracts from Hita
  • Nissan moves to speed up EV charging infrastructure
    February 29, 2012
    Nissan has teamed up with leading European utility and electrical vehicle (EV) supply equipment companies to speed development of cheaper, smaller, quick chargers for electric vehicle batteries, and accelerate the installation of publicly-available Quick Charge (QC) points across Europe.
  • Road Safety Foundation: low-cost road safety improvements pay off
    December 3, 2014
    A major speed limit review in the county resulted in the speed limit be reduced from around 65kph (40mph) to 48kph (30mph) on two short sections through the town of Amersham.
  • Mega city transport in Mexico
    June 13, 2012
    Rapid urban growth is resulting in massive mega cities with major transport needs and Mexico City is one of the world’s largest – Mike Woof reports Mexico City is a vast, sprawling metropolis and one of the world’s largest cities, resulting in huge problems for its inhabitants, particularly with regard to infrastructure. Measuring population size is an inexact science for large cities as suburban areas can add to the figures considerably, especially in developing nations where unplanned expansion is as comm